← 440 Louden Ave, Dunedin, FL 34698 · Portfolio index

Inspection Report Repairs - 440 Louden Ave, Dunedin, FL 34698 (2).pdf

Generated 2026-07-01T16:39:32.685095+00:00 from live Dropbox Public folders.

Property440 Louden Ave, Dunedin, FL 34698
Section09 - Inspection Report
Categorypdf
Relative path09 - Inspection Report/Inspection Report Repairs - 440 Louden Ave, Dunedin, FL 34698 (2).pdf
Modified UTC2024-02-27T23:14:12+00:00
Size bytes68500
Extraction methodpdftotext-incremental

Description

Sunrise Electric 1215 12th St, Palm Harbor, Florida 34683-4014 United States (727) 308-6383 LIC. # EC13010400 BILL TO Alec Van Beek 2244 Lagoon Drive Dunedin, FL 34698 USA J O B A D D R ES S 440 Louden Avenue Unit A 440 Louden Avenue #A Dunedin, FL 34698 USA INVOICE INVOICE DATE 63636623 Feb 23, 2024 Completed Date: 2/22/2024 Payment Term: Due Upon Receipt Due Date: 2/23/2024 D ES C R I P T I O N O F WO R K xREASON FOR CALL: - bath fan not working properly SYSTEM EVALUATION: - dual meter base -

Extracted Content

Sunrise Electric 1215 12th St, Palm Harbor, Florida 34683-4014 United States (727) 308-6383 LIC. # EC13010400 BILL TO Alec Van Beek 2244 Lagoon Drive Dunedin, FL 34698 USA J O B A D D R ES S 440 Louden Avenue Unit A 440 Louden Avenue #A Dunedin, FL 34698 USA INVOICE INVOICE DATE 63636623 Feb 23, 2024 Completed Date: 2/22/2024 Payment Term: Due Upon Receipt Due Date: 2/23/2024 D ES C R I P T I O N O F WO R K xREASON FOR CALL: - bath fan not working properly SYSTEM EVALUATION: - dual meter base - 2x 100 amp main breaker panels DIAGNOSIS: - upon inspection of panel for unit A it was discovered that one side leg of the panel is thermally overloading before the main breaker. Causing connection issues. - it was discovered that previous work done to confer overhead service to underground service was done incorrectly by using improper connectors and or grounding/bonding - meter bases are below appropriate height. - meter base is heavily corroded on lugs. SOLUTION: - replace both 100 amp main breaker outdoor panels with ch series all copper bus bar panels. - replace dual meter base and bring up to appropriate height. - install new surge protection devices is each electrical 100amp main brea