← 1456 W 85th St, Cleveland, OH 44102 · All properties

B2B Estimate 9815-1 - 2023-05-25 - Shower Water Line Leak Repairs - USD 1932.00 - 1456 W 85th Unit 1 - 1456 W 85th St, Cleveland, OH 44102.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property1456 W 85th St, Cleveland, OH 44102
FolderRepairs & Maintenance
KindPDF
Updated2023-05-25
Dropbox path08 - Repairs & Maintenance/B2B Estimate 9815-1 - 2023-05-25 - Shower Water Line Leak Repairs - USD 1932.00 - 1456 W 85th Unit 1 - 1456 W 85th St, Cleveland, OH 44102.pdf

What This File Appears To Be

Exhibit A: Contractor Documents ESTIMATE Contractor is being hired by B2B Property Management Est. #:9815-1 on behalf of the property owner Date: Valid for 30 days Project Address: 1456 W 85 ST. - Unit 1 Pricing includes parts and labor INSPECTION ITEM # Item # ITEM DESCRIPTION UNITS Need to replace water lines from cut area in the basement up to the shower and possibly the shower head including a new faucet for multiple leaks and ruptures flooding the basement. Also includes installation of two

Text Preview

Exhibit A: Contractor Documents

ESTIMATE
Contractor is being hired by B2B Property Management

Est. #:9815-1

on behalf of the property owner
Date:

Valid for 30 days

Project Address: 1456 W 85 ST. - Unit 1

Pricing includes parts and labor
INSPECTION ITEM #

Item #

ITEM DESCRIPTION

UNITS

Need to replace water lines from cut area in the basement up to the
shower and possibly the shower head including a new faucet for
multiple leaks and ruptures flooding the basement. Also includes
installation of two new shut up valves, faucet, hot and cold water
lines and all fittings. Includes the one hundred dollar assessment
charge for today which will be invoiced if job is not received,
thanks.

1

TOTAL

PRICE / UNIT

$

1,840.00

SUBTOTAL
B2B PM

$

1,840.00

$

92.00

TOTAL

$ 1,932.00

$

1,840.00

Memo: Contractor shall furnish any and all permits required for the completion of the project. Pricing includes charges
for labour and materials. Additional charges, deviation, or emergency repairs must be approved in writing by Owner.
Contractor certifies having proper insurance coverage to carry out the project. B2B Property Management is acting as a
project manager agent and shall not be held liable for any of the performance or quality of the work performed by
contractor, nor for any delays in payment, or other failures of property owner to perform on its contractual duties and
obligations.
Owner’s Initials: ________ Contractor’s Initials: ________ Project Manager’s Initials: ________