What This File Appears To Be
3/3/26, 11:49 PM Hemlane Maintenance Back to request SERVICE PROFESSIONAL In Status Progress arrow_drop_down Andrew Downing JobConnect Ref No REF-PWHPQ826 Status In Progress Created At January 29th, 2026 Last Updated 9 days ago Job Address 1518 Dille Road (703) 728-4321 connect@usjobconnect.com COORDINATED BY Nancy Kay (415) 417-1656 SCHEDULING CONTACT Unit 1518 Michelle Fulcomer Euclid, OH 44117 (216) 882-5820 Toi Bibbs (216) 294-8763 BILL TO CONTACT Whalec Property Management - Owner 1518 Dill
Text Preview
3/3/26, 11:49 PM Hemlane Maintenance Back to request SERVICE PROFESSIONAL In Status Progress arrow_drop_down Andrew Downing JobConnect Ref No REF-PWHPQ826 Status In Progress Created At January 29th, 2026 Last Updated 9 days ago Job Address 1518 Dille Road (703) 728-4321 connect@usjobconnect.com COORDINATED BY Nancy Kay (415) 417-1656 SCHEDULING CONTACT Unit 1518 Michelle Fulcomer Euclid, OH 44117 (216) 882-5820 Toi Bibbs (216) 294-8763 BILL TO CONTACT Whalec Property Management - Owner 1518 Dille Road, Euclid, OH 44117 (415) 417-1656 repairs@hemlane.com Work Order Estimates & Invoices (5) Photos and Docs (25) Basement flooding from outside water seepage INSTRUCTIONS There’s water in the basement not sure where it’s coming from - most likely through the exterior walls https://www.hemlane.com/work-order/fbe7686e-98f0-4f51-93f9-cee266457c14/ 1/7 3/3/26, 11:49 PM Hemlane Maintenance PRICING ESTIMATE No estimate provided. SCHEDULED DATE Feb 23 2026, 8:00 am to 12:00 pm UPDATES Enter your updates here... Earl Co (ECO Systems) Mar 3, 2026 Hi Andrew, am I understanding this correctly that it's two separate invoices that are added up? I'm still trying to wrap my head around at 11:37 pm how this scope of work came to be so expensive. Nancy Kay (Coordinator) Hi Andrew, Feb 25, 2026 at 2:21 am Thanks for the detailed information. We look forward to your next update. We will work on making payment in the morning and in the meantime don't hesitate to reach out if you have any questions or concerns. Thanks, Nancy Andrew Downing AD Invoice link: Feb 25, 2026 at 1:31 am https://connect.intuit.com/portal/app/CommerceNetwork/view/s cs-v1c82d927655814358a9e39209667d5a8498a128997cde4eb3895 3bbd200b1f1a867d4952bcf734146987c789219e81731? locale=en_US&utm_source=sharelink Andrew Downing AD Feb 25, 2026 We returned to continue clean-up. As for the 2 clean-outs we had to open up. We capped and poured concrete over the one on the at 12:56 am far wall. As for the one mid-room, we turned it into a drain as that space could use a second drain. The floor was still wet. I think it will take a couple weeks before we can scrape all of the paint and reseal it. I will get that estimate over. We were able to address all of the upstairs items, as well. In addition to clearing the 2 drains upstairs, we noticed that there has been a pretty steady stream coming down the stack. We identified the second floor toilet as https://www.hemlane.com/work-order/fbe7686e-98f0-4f51-93f9-cee266457c14/ 2/7