Hemlane Maintenance Work Order Basement Sewer Flood 2026-02 - 1518 Dille Rd - Ohio 3 Property Package, Akron, Ohio 44117.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property1518 Dille Rd
FolderRepairs & Maintenance
KindPDF
Updated2026-03-03
Dropbox path1518 Dille Road, Euclid, OH 44117/Repairs/Hemlane Maintenance Work Order Basement Sewer Flood 2026-02 - 1518 Dille Rd - Ohio 3 Property Package, Akron, Ohio 44117.pdf

What This File Appears To Be

3/3/26, 11:49 PM Hemlane Maintenance Back to request SERVICE PROFESSIONAL In Status Progress arrow_drop_down Andrew Downing JobConnect Ref No REF-PWHPQ826 Status In Progress Created At January 29th, 2026 Last Updated 9 days ago Job Address 1518 Dille Road (703) 728-4321 connect@usjobconnect.com COORDINATED BY Nancy Kay (415) 417-1656 SCHEDULING CONTACT Unit 1518 Michelle Fulcomer Euclid, OH 44117 (216) 882-5820 Toi Bibbs (216) 294-8763 BILL TO CONTACT Whalec Property Management - Owner 1518 Dill

Text Preview

3/3/26, 11:49 PM

Hemlane Maintenance

Back to request

SERVICE PROFESSIONAL

In

Status

Progress

arrow_drop_down

Andrew Downing
JobConnect

Ref No

REF-PWHPQ826

Status

In Progress

Created At

January 29th, 2026

Last Updated

9 days ago

Job Address

1518 Dille Road

(703) 728-4321
connect@usjobconnect.com

COORDINATED BY

Nancy Kay
(415) 417-1656

SCHEDULING CONTACT

Unit 1518

Michelle Fulcomer

Euclid, OH 44117

(216) 882-5820

Toi Bibbs
(216) 294-8763

BILL TO CONTACT

Whalec Property Management - Owner
1518 Dille Road, Euclid, OH 44117
(415) 417-1656
repairs@hemlane.com

Work Order

Estimates & Invoices (5)

Photos and Docs (25)

Basement flooding from outside water seepage

INSTRUCTIONS

There’s water in the basement not sure where it’s coming from - most likely through the exterior
walls

https://www.hemlane.com/work-order/fbe7686e-98f0-4f51-93f9-cee266457c14/

1/7

3/3/26, 11:49 PM

Hemlane Maintenance

PRICING ESTIMATE

No estimate provided.

SCHEDULED DATE

Feb 23 2026, 8:00 am to 12:00 pm

UPDATES

Enter your updates here...

Earl Co (ECO Systems)
Mar 3, 2026

Hi Andrew, am I understanding this correctly that it's two separate
invoices that are added up? I'm still trying to wrap my head around

at 11:37 pm

how this scope of work came to be so expensive.

Nancy Kay (Coordinator)

Hi Andrew,

Feb 25, 2026
at 2:21 am

Thanks for the detailed information. We look forward to your next
update. We will work on making payment in the morning and in
the meantime don't hesitate to reach out if you have any
questions or concerns.

Thanks,
Nancy

Andrew Downing

AD

Invoice link:

Feb 25, 2026
at 1:31 am

https://connect.intuit.com/portal/app/CommerceNetwork/view/s
cs-v1c82d927655814358a9e39209667d5a8498a128997cde4eb3895
3bbd200b1f1a867d4952bcf734146987c789219e81731?
locale=en_US&utm_source=sharelink

Andrew Downing

AD

Feb 25, 2026

We returned to continue clean-up. As for the 2 clean-outs we had
to open up. We capped and poured concrete over the one on the

at 12:56 am

far wall. As for the one mid-room, we turned it into a drain as that
space could use a second drain. The floor was still wet. I think it
will take a couple weeks before we can scrape all of the paint and
reseal it. I will get that estimate over. We were able to address all
of the upstairs items, as well. In addition to clearing the 2 drains
upstairs, we noticed that there has been a pretty steady stream
coming down the stack. We identified the second floor toilet as