← 1321 Allendale Ave, Akron, OH 44306 · All properties

Estimate 1 A2Z (2024-08-29) - 1321 Allendale Ave, Akron, OH 44306 - Ohio 3 Property Package, Akron, Ohio 44117.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property1321 Allendale Ave, Akron, OH 44306
FolderRepairs & Maintenance
KindPDF
Updated2024-09-01
Dropbox path1321 Allendale Ave, Akron, OH 44306/Repairs/Estimate 1 A2Z (2024-08-29) - 1321 Allendale Ave, Akron, OH 44306 - Ohio 3 Property Package, Akron, Ohio 44117.pdf

What This File Appears To Be

A2Z Field Services 7450 Industrial Parkway, Suite 105 Plain City, OH 43064 Phone: (614) 873-0211 Fax: (614) 873-0988 Bid printed on 8/21/2024 4083963 Property Information Acct: ALLE1321 Address: 1321 ALLENDALE AVE AKRON, OH-44306 Client Name: HomeRiver Group Service Flooring Unit Price # Units $12.50 99 Total Price $1,237.50 Notes Other Preservation Services $5.50 240 $1,320.00 Basement walls: Bid to cut out 240 sqft of damaged drywall along perimeter of basement finished side walls. 29’x11’x3’.

Text Preview

A2Z Field Services
7450 Industrial Parkway, Suite 105
Plain City, OH 43064
Phone: (614) 873-0211
Fax: (614) 873-0988
Bid printed on 8/21/2024

4083963

Property Information
Acct: ALLE1321
Address: 1321 ALLENDALE AVE
AKRON, OH-44306
Client Name: HomeRiver Group
Service
Flooring

Unit Price # Units
$12.50
99

Total Price
$1,237.50

Notes

Other Preservation Services

$5.50

240

$1,320.00

Basement walls: Bid to cut out 240 sqft of damaged drywall
along perimeter of basement finished side walls. 29’x11’x3’.
Will accumulate approx 6 cyd plus labor and materials.
Basement walls: Bid to cut out 240 sqft of damaged drywall
along perimeter of basement finished side walls. 29’x11’x3’.
Will accumulate approx 6 cyd plus labor and materials.

Other Preservation Services

$325.00

1

$325.00

Bid to scrap loose ceiling, mud/patch small holes, paint white. Submitted To
Will need to buy a texture tool print to match existing texture Client
best to match.
Bid to scrap loose ceiling, mud/patch small holes, paint white.
Will need to buy a texture tool print to match existing texture
best to match.

Bid to remove VCT flooring from finished side of basement.
The tiles are original to the home and will be very hard to
remove. Will need industrial scrapers. VCT debris removal is
heavy and cost more to dump. Labor tedious. 3 man, 4-6
hours. 11’x 29’. Will remove down to cement.
Bid to remove VCT flooring from finished side of basement.
The tiles are original to the home and will be very hard to
remove. Will need industrial scrapers. VCT debris removal is
heavy and cost more to dump. Labor tedious. 3 man, 4-6
hours. 11’x 29’. Will remove down to cement.

Status
Submitted To
Client

Submitted To
Client

Bid Total: $2,882.50