← 1258 Lily St, Akron, OH 44301 · All properties
Repair Estimate 1 (Revised) - 1258 Lily St, Akron, OH 44301 - Ohio 3 Property Package, Akron, Ohio 44117.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 1258 Lily St, Akron, OH 44301 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2024-06-29 |
| Dropbox path | 1258 Lily St, Akron, OH 44301/Repairs/Repair Estimate 1 (Revised) - 1258 Lily St, Akron, OH 44301 - Ohio 3 Property Package, Akron, Ohio 44117.pdf |
What This File Appears To Be
Bid Sheet Mooninlight Trading LLC WO #: TIAYLMT Work Type: Bid request Loan #: Client Company: Home River Group Due Date: April 18, 2024 Address: 1258 Lily St UNIT LILY1258 Akron, OH 44301227 Remove basement items /debris Qty Client Price Total 1 $450.00 $450.00 $125.00 $125.00 1 $150.00 $150.00 1 $653.12 $653.12 Need to remove debris and personals from the basement include tars, useable item and trash Repair front door 1 Need to remove and replace the door latch and re-set the door include mate
Text Preview
Bid Sheet Mooninlight Trading LLC WO #: TIAYLMT Work Type: Bid request Loan #: Client Company: Home River Group Due Date: April 18, 2024 Address: 1258 Lily St UNIT LILY1258 Akron, OH 44301227 Remove basement items /debris Qty Client Price Total 1 $450.00 $450.00 $125.00 $125.00 1 $150.00 $150.00 1 $653.12 $653.12 Need to remove debris and personals from the basement include tars, useable item and trash Repair front door 1 Need to remove and replace the door latch and re-set the door include materials and labor Remove item, front porch Need to remove all items from the front porch area and haul away Remove and replace front porch steps Need to remove all damaged steps from the front porch deck area and replace with new pre fabricated wood steps include materials and labor to prevent damages Need to replace approx 5 LF handrails Materials 4 E/A X $98.28 = $393.12 Need 2 men 2 hours - $260.00 Upstairs bathroom door paint 1 $135.00 $135.00 $75.00 $75.00 1 $92.28 $92.28 1 $275.20 $275.20 1 $65.00 $65.00 1 $25.00 $25.00 1 $85.00 $85.00 1 $156.10 $156.10 Need to paint over the bathroom door both side to match existing as best possible to prevent Clean upstairs bathroom floor 1 Bathroom upstairs flooring and baseboard needed to be clean out include materials and labor Replace Bathroom upstairs dome light Need to replace the Bathroom upstairs dome light include materials and labor Install upstairs bathroom mirror Need to install flat Wall mirror on the upstairs bathroom wall include materials and labor Mirror materials - $135.20 Labor - $140.00 Remove shower curtain and rod Need to remove shower curtain and rod from the upstairs bathroom Replace outlet cover Need to replace upstairs bathroom outlet cover include materials and labor Replace toilet seat cover Replace (1) toilet seat cover in the upstairs bathroom include materials and labor Replace door panel WO #: TIAYLMT Work Type: Bid request Bid Sheet (cont.) Qty Need to replace the door panel on the Bedroom Off of dining room include materials and labor Remove bedroom off of dining items Price Total 1 $450.00 $450.00 1 $155.00 $155.00 Need to remove all items from the bedroom off of dining room and haul away Patch and paint walls Need to patch and paint on the walls and ceiling in the Bedroom: Off of dining room as needed include materials and labor Remove window blinds 1 $50.00 $50.00 1 $180.00 $180.00 1 $428.00 $428.00 Need to remove the bedroom off of dining room window blinds include haul away debris Remove window A/C unit Need to remove the bedroom off of dining room window A/C and dispose off Install door on bedroom 2 ` Need to install new door on the bedroom 2 include door jamb and hinges included locks to secure - Missing Clean carpets bedroom off of dining room 1 $195.00 $195.00 Need to clean out the carpets of the bedroom off of dining room approx 1320 SF include cleaning materials and labor Clean carpet bedroom 2 1 $175.00 $175.00 Need to clean out the carpets of the bedroom2 approx 120 SF include cleaning materials and labor Remove and replace outlet switch 1 $85.00 $85.00 $125.00 $125.00 Need to remove and replace 3 Pin outlet switch in the bedroom#2 include materials and labor Patch and paint bedroom2 walls and ceiling 1 Need to patch and paint on the walls and ceiling in the bedroom#2 as needed to match existing as best possible include materials and labor Remove bedroom#2 window blinds 1 $50.00 $50.00 1 $220.00 $220.00 1 $50.00 $50.00 1 $250.00 $250.00 Need to remove the bedroom#2 window blinds/covers include haul away debris Remove items/debris dining room Need to remove all items and debris from the dining room and haul away Remove window blinds Need to remove the dining room window blinds/covers include haul away debris Remove items from kitchen Need to remove all items/personals from the kitchen drawer , counter top and floor and haul away as debris Repair kitchen floor gaps 1 $225.00 $225.00 Need to re-finish the kitchen flooring boards gaps include finishing materials and labor approx 30 SF area to prevent further damages Patch and paint kitchen wall and ceiling 1 $205.00 $205.00 Need to patch and paint on the walls and ceiling in the kitchen as needed to match existing as best possible include materials and labor Remove window screen and locks 1 $50.00 $50.00