Text Preview
# Property Update – Sewer Backup Remediation **Property:** 1518 Dille Rd, Euclid, OH **Owner:** Lofty Holding 1518 Dille Road DAO LLC **Date:** March 2026 --- ## Summary In February 2026, the property experienced a **sewer line blockage** that resulted in wastewater backing up into the basement. A plumbing contractor cleared the main sewer line and performed remediation work. The obstruction was determined to be caused by **foreign materials (tampons and non-flushable wipes)** disposed of through the plumbing system. The contractor reported removal of **dozens of hygiene products and wipes** from the line during clearing operations. [oai_citation:0‡Invoice_1518_Dille_Euclid_OH_from_Andrew_Downing.pdf](sediment://file_00000000cb5071f589bcc7b961b50fe6) The plumber noted: > “If this continues we will likely be back in a few weeks even with a completely clear/clean line. Our plumber has 20 years experience with line-clearing and notes this as the most difficult to clear of his career.” [oai_citation:1‡Invoice_REFPWHPQ826__2_from_Andrew_Downing.pdf](sediment://file_000000001994722f8e2d7cd03f0b8276) --- ## Work Completed The contractor performed the following: - Main sewer line clearing using heavy augering (up to 100 ft) - Hydro-jetting the entire sewer line to the street - Basement wastewater cleanup and disinfection - Installation and sealing of additional drain access - Clearing of interior drains - Minor plumbing repair (toilet fluidmaster) The line is now fully operational. --- ## Cost Summary | Description | Amount | |---|---| Emergency sewer clearing & remediation | $1,900 | Follow-up cleanup and plumbing work | $2,080 | | **Total** | **$3,980** | --- ## Financial Impact Because the blockage was caused by **tenant disposal of prohibited materials**, the repair costs are being **allocated to the tenant households under the lease provisions governing plumbing misuse and drain stoppages**. [oai_citation:2‡1518DilleRoad,Unit1518LeaseAgreement_Redacted.pdf](sediment://file_000000003430722f9b8dcede6da103fa) **Expected impact to property reserves:** **$0 (tenant chargeback in progress)** --- ## Current Status - Sewer line cleared and functioning normally - Basement cleaned and disinfected - Plumbing repairs completed - Preventive instructions issued to tenants No structural plumbing defects were identified once the obstruction was removed. --- ## Takeaway This was a **tenant-caused operational issue rather than an infrastructure failure**. The incident has been resolved and costs are being recovered from tenants in accordance with lease terms.