← Ohio 3-Property Package · Portfolio index
JobConnect Sewer Cleanouts Receipt 2025-02-10 - 1518 Dille Rd.pdf
| Property | Ohio 3-Property Package |
|---|---|
| Section | 1518 Dille Road, Euclid, OH 44117 |
| Category | |
| Relative path | 1518 Dille Road, Euclid, OH 44117/Repairs/JobConnect Sewer Cleanouts Receipt 2025-02-10 - 1518 Dille Rd.pdf |
| Modified UTC | 2026-03-09T02:31:18+00:00 |
| Size bytes | 40385 |
| Extraction method | pdftotext-incremental |
Description
INVOICE Andrew Downing 709 Walden Pond Cir Hinckley, OH 44233 connect@usjobconnect.com +1 (703) 728-4321 Bill to Ship to Hemlane, Inc Hemlane, Inc Invoice details Invoice no.: 1518 Dille, Euclid OH Terms: Due on receipt Invoice date: 02/10/2026 Due date: 02/10/2026 # Product or service Description Qty Rate Amount 1. Services 1518 Dille Rd 1 $0.00 $0.00 1 $1,900.00 $1,900.00 Euclid, OH 44117 Ref: REF-72T4IIEX Estimate was to clear and repair drain tile in basement and stop constant flooding. 2. S
Extracted Content
INVOICE Andrew Downing 709 Walden Pond Cir Hinckley, OH 44233 connect@usjobconnect.com +1 (703) 728-4321 Bill to Ship to Hemlane, Inc Hemlane, Inc Invoice details Invoice no.: 1518 Dille, Euclid OH Terms: Due on receipt Invoice date: 02/10/2026 Due date: 02/10/2026 # Product or service Description Qty Rate Amount 1. Services 1518 Dille Rd 1 $0.00 $0.00 1 $1,900.00 $1,900.00 Euclid, OH 44117 Ref: REF-72T4IIEX Estimate was to clear and repair drain tile in basement and stop constant flooding. 2. Services OPTION 2After quoting the basement filled up with a couple inches of wastewater. Here is the scope of work (and notes) to correct the issue: That was a serious clog. We pulled out approximately 15 gallons of solid waste. Non-flushable wipes, 50+ tampons, etc. I will attach the pictures. Here is the scope of work for 2 techs that worked on it all day: -Inspected and attempted initial clearing of drain by removing surface debris and snaking with 35 ft auger. -Advanced to heavy-duty 5/8" auger, running to 100 ft multiple passes through affected drain line. -Accessed and snaked main cleanout to isolate and clear downstream obstruction. -Performed hydro-jet assisted flushing concurrently