← 9919 S Oglesby Ave, Chicago, IL 60617 · All properties

Repair Estimate - 2025-01-22 - 9919 S Oglesby Ave Chicago IL, 60617.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property9919 S Oglesby Ave, Chicago, IL 60617
FolderRepairs & Maintenance
KindPDF
Updated2025-01-24
Dropbox path08 - Repairs & Maintenance/Repair Estimate - 2025-01-22 - 9919 S Oglesby Ave Chicago IL, 60617.pdf

What This File Appears To Be

1/22/25, 7:45 PM First Allegiance Corporate Headquarters: 30 Union Street, Suite 44, Elizabeth, NJ 07202 Phone: (888) 727-6303 Fax: 201-823-8505 info@firstallegiance.com Property Information Loan# OGLE9919 Client HomeRiver Group Asset Specialist Ben Hirsch Bank Name Private Property Address 9919 S Oglesby Ave, Chicago, IL 60617 Property Type SFR Maintenance - Kitchen Flooring, Bathtub, Toilet - Main House Bid # 807706 Bid Title Bid Amount $913.00 Service Maintenance - Kitchen Flooring, Bathtub,

Text Preview

1/22/25, 7:45 PM
First Allegiance
Corporate Headquarters:
30 Union Street,
Suite 44,
Elizabeth, NJ 07202
Phone: (888) 727-6303
Fax: 201-823-8505
info@firstallegiance.com

Property Information
Loan#

OGLE9919

Client

HomeRiver Group

Asset Specialist

Ben Hirsch

Bank Name

Private

Property Address

9919 S Oglesby Ave, Chicago, IL 60617

Property Type

SFR
Maintenance - Kitchen Flooring, Bathtub, Toilet - Main House

Bid #

807706

Bid Title

Bid

Amount

$913.00

Service

Maintenance - Kitchen Flooring, Bathtub, Toilet - Main House

Unit:

Unit 1 [Default_1]

Description / Comment

We are sending this bid as per client's request. This bid is needed to ensure the property is
safe and functional.
$207.50: Kitchen floor
Bid is to install approximately 18 square feet of vinyl flooring located in the kitchen of the
house The reason for the install is hole in the floor. This is needed to prevent damages to
the property and avoid safety hazards. Bid includes materials, labor and disposal of all
generated debris. Repair underlayment 6x3 and install new flooring best match over.
$415.00: Recaulk bathtub
Bid is to, Re-caulk the bathtub with silicone sealant caulk. First we need to scrub off the
previous caulk and apply silicone sealant caulk. This is because it will prevent water
damage, leaks, or mold growth. There is only 1 bathroom with a bathtub. The property has
1.5 baths. This is the only tub. Cost inclusive of labor and materials required
$290.50: Loose toilet
Bid is to, Reseat toilet and caulk the base. Cost inclusive of labor and materials required This is not causing further damage.
Bid includes materials, labor, and the removal of any generated debris from the site. - This
is not causing further damage.

Submitted date

01/21/2025 12:09:21 PM

Attached Document

Page 1 / 1

Loan#: OGLE9919 Address: 9919 S Oglesby Ave, Chicago, IL 60617
Bank: Private Client: HomeRiver Group
Photo Group(s): Maintenance - Bid - Main House

Maintenance - Bid - Main House

Maintenance - Bid - Main House
Page 1 / 13