← 9919 S Oglesby Ave, Chicago, IL 60617 · All properties

Repair Invoice - 2022-03-22 - 9919 S Oglesby Ave Chicago IL, 60617 - 9919 S Oglesby Ave, Chicago, IL 60617.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property9919 S Oglesby Ave, Chicago, IL 60617
FolderRepairs & Maintenance
KindPDF
Updated2022-06-30
Dropbox path08 - Repairs & Maintenance/Repair Invoice - 2022-03-22 - 9919 S Oglesby Ave Chicago IL, 60617 - 9919 S Oglesby Ave, Chicago, IL 60617.pdf

What This File Appears To Be

Estimate of Work Property Address Portfolio Name Work Order # Estimate Date 9919 S Oglesby Ave 22656 3/22/22 Rooms Costs ($) Front Entry/Foyer $40.32 Hallway/Stairs 1 $300.88 Living Room $411.64 Dining Room 1 $235.26 Bedroom 1 $495.44 Bedroom 2 $976.18 Bedroom 3 $374.70 Bedroom 4 $504.72 Bathroom 1 $181.90 Bathroom 2 $819.96 Hallway/Stairs 2 $366.22 Kitchen $297.48 Front yard $0.00 Basement $227.36 Miscellaneous $2,336.49 Total $7,568.55 DISCLAIMER: Area Entry 1: Exterior 6by4 Comment -clean bas

Text Preview

Estimate of Work
Property Address
Portfolio Name
Work Order #
Estimate Date

9919 S Oglesby Ave
22656
3/22/22

Rooms

Costs ($)

Front Entry/Foyer

$40.32

Hallway/Stairs 1

$300.88

Living Room

$411.64

Dining Room 1

$235.26

Bedroom 1

$495.44

Bedroom 2

$976.18

Bedroom 3

$374.70

Bedroom 4

$504.72

Bathroom 1

$181.90

Bathroom 2

$819.96

Hallway/Stairs 2

$366.22

Kitchen

$297.48

Front yard

$0.00

Basement

$227.36

Miscellaneous

$2,336.49

Total

$7,568.55

DISCLAIMER:

Area
Entry 1: Exterior 6by4

Comment
-clean baseboard
-paint walls (Exterior Paint Needed), minor patch and prep needed

Hallway/Stairs 1 +
Rear Entry Door 18by5

-paint baseboard
-paint window ledge, sand and reseal prior
-paint window frame trim, sand and reseal
-paint walls, patch and prep needed
-replace bottom silicone door sweep
-paint entryway from Living Room, sand and reseal
-paint exterior side of closet bifold door
-paint door frame trim +Jam
-paint baseboards
Note: walls and ceiling paneled and in great shape

Closet 4by2

Living Room 1: +
Front Entry Door 18by11

-clean baseboard
-paint both sides of the door
-paint door frame trim+Jam sand and reseal
-paint walls, patch and prep needed
-paint window ledge (West window)
-paint window frame trim, sand and reseal

Dining Room 1: 12by9

-paint baseboard
-replace lightbulbs in light fixture (Price Pending: fixture
replacement if not working after lightbulb replacement)
-paint walls, patch and prep needed
-paint entryway from Living Room sand and reseal prior
-remove drapes only (west window)
-paint window ledge, sand and reseal (west window)
-paint window frame trim (west window)

Bedroom 1: Main Floor Rear 15by11

-paint baseboard
-paint both sides of the door
-paint door frame trim+Jam
-paint walls, patch and prep needed
-remove all fou broken blinds from windows
-paint window ledge, total for both
-paint window frame trim, sand and reseal prior
-paint exterior side of closet bifold door
-paint door frame trim+ Jam
-paint walls, minor patch and prep needed

Closet 4by2