← 9902 Garfield Ave, Cleveland, OH, 44108 · Portfolio index

workorder14k.pdf

Generated 2026-07-01T16:39:32.685095+00:00 from live Dropbox Public folders.

Property9902 Garfield Ave, Cleveland, OH, 44108
Section99 - Miscellaneous
Categorypdf
Relative path99 - Miscellaneous/workorder14k.pdf
Modified UTC2025-05-12T07:20:19+00:00
Size bytes82111
Extraction methodpdftotext-incremental

Description

AAPK Property Management LLC 19885 Detroit Road #287 Rocky River, OH 44116 Phone - (216) 249-4928 Work Order # 3013-1 Status Estimated Created On 05/09/2025 Estimate Requested On 05/09/2025 Estimate Amount -- Estimated On 05/09/2025 Scheduled On -- Completed On -- Permission to Enter N/A Job Site 9902 Garfield Ave 9902 Garfield Ave Cleveland, OH 44108 Pet(s) -- Note: property built before 1978. Tenant(s) No Current Tenant Description Unit Turn: First Floor -Install 10 years sealed smoke and CO d

Extracted Content

AAPK Property Management LLC 19885 Detroit Road #287 Rocky River, OH 44116 Phone - (216) 249-4928 Work Order # 3013-1 Status Estimated Created On 05/09/2025 Estimate Requested On 05/09/2025 Estimate Amount -- Estimated On 05/09/2025 Scheduled On -- Completed On -- Permission to Enter N/A Job Site 9902 Garfield Ave 9902 Garfield Ave Cleveland, OH 44108 Pet(s) -- Note: property built before 1978. Tenant(s) No Current Tenant Description Unit Turn: First Floor -Install 10 years sealed smoke and CO detectors -Mirror above fireplace is cracked -Replace the tile in front of the fireplace -Replace painted switches -Replace kitchen floor -Front door repair to close properly -Wall Prep and paint throughout -Install carpet as needed throughout Second Floor -Install 10 years sealed smoke and CO detectors -Wall Prep and paint throughout -Ceiling and walls need prepped, they are cracked and then need repainted -Doors do not close properly -Properly secure toilet. -Replace bathroom vanity, plumbing, and faucet -Tub re-caulk and refinish -Replace bathroom floor -Install carpet as needed throughout -Kitchen cabinets (Update as needed or fix current cabinets) -Kitchen floor needs replaced. Basement