← 9634 S Green St, Chicago, IL 60643 · All properties

Repair Invoice - 2023-11-04 - 9634 S Green Street, Chicago, IL 60643.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property9634 S Green St, Chicago, IL 60643
FolderRepairs & Maintenance
KindPDF
Updated2023-11-04
Dropbox path08 - Repairs & Maintenance/Repair Invoice - 2023-11-04 - 9634 S Green Street, Chicago, IL 60643.pdf

What This File Appears To Be

Bid Sheet ZVN Properties, Inc. WO #: THGW6U9 Loan #: Work Type: MAINTENANCE - Bid Request Client Company: Home River Group Due Date: October 26, 2023 Customer: Maintenance Address: 9634 S Green St Chicago, IL 60643 UOM Flood Control Replacement Qty Client Price Total 1 $14,191.17 $14,191.17 A &B sewer will come out to existing flood control system and take a jack hammer to break out existing box valve and expose up to 6 ft of sewer. Once old valve is removed we will take out pump and 2inch line.

Text Preview

Bid Sheet

ZVN Properties, Inc.

WO #: THGW6U9
Loan #:
Work Type: MAINTENANCE - Bid Request
Client Company: Home River Group

Due Date: October 26, 2023

Customer: Maintenance
Address: 9634 S Green St
Chicago, IL 60643
UOM
Flood Control Replacement

Qty

Client Price

Total

1

$14,191.17

$14,191.17

A &B sewer will come out to existing flood control system and take a jack hammer to break out existing box valve and expose up
to 6 ft of sewer. Once old valve is removed we will take out pump and 2inch line. A new double check valve system will be
installed with a new y fitting going to pit. 2 inch copper piping diverted infront of valve. All proper connections will be done up to
City of Chicago code, new sewer will be embedded in 3/4 gravel so no shifting occurs. Work will be inspected by City of Chicago.
Then we will Recement any concrete. We will also have to dig on both sides to gain access to sewer coming and going out.
Permit, material and labor included in price.
Total: $14,191.17