โ 9634 S Green St, Chicago, IL 60643 ยท All properties
Crawford Construction Estimate 3495 - 2024-09-24 - Mold Remediation Turn Proposal - 9634 S Green St.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 9634 S Green St, Chicago, IL 60643 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2024-10-19 |
| Dropbox path | 08 - Repairs & Maintenance/Crawford Construction Estimate 3495 - 2024-09-24 - Mold Remediation Turn Proposal - 9634 S Green St.pdf |
What This File Appears To Be
Crawford Construction Corp. Estimate 5113 S Harper Ave Chicago, IL, 60615-4119 Estimate No: 3495 Date: 09/24/2024 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO#: TPPLNR3 - Address: 9634 S Green St, Chicago, IL 60643 2 Turn Proposal Code Description Mold Remediation HEPA Vacuuming w/ (Fogging/Duct Cleaning) - Detailed - (PER SF) - 985.00 SF - Optional: Includes: Equipment and labo
Text Preview
Crawford Construction Corp. Estimate 5113 S Harper Ave Chicago, IL, 60615-4119 Estimate No: 3495 Date: 09/24/2024 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO#: TPPLNR3 - Address: 9634 S Green St, Chicago, IL 60643 2 Turn Proposal Code Description Mold Remediation HEPA Vacuuming w/ (Fogging/Duct Cleaning) - Detailed - (PER SF) - 985.00 SF - Optional: Includes: Equipment and labor to vacuum. Detailed HEPA vacuuming. Quantity Rate Amount 985 $1.75 $1,723.75 1 $725.00 $725.00 Quality: Medium size back pack or canister type HEPA vacuums. Notes: Normally used in a water/contamination clean-up situation where airborne mold spores, etc. are present, but may also be used for other applications (soot or dust removal, etc.). Fogging treatment of the entire living space, at the reference location: Work will be performed per task, as described below: - Workers to wear the appropriate PPE while performing the treatment in the crawlspace area - Fog the entire home using a ULV sprayer with an EPA - Registered Disinfectant โ Owners would need be out for 4-6 hours (estimated time) 3. HEPA vacuum all debris in the living room and kitchen. Wipe down wall surfaces in the living room with an EPA registered anti microbial application. Mold Remediation - Optional: Air Clearance Testing - Contamination - air or surface testing & lab analysis - 1.00 EA Notes: Includes recommendation if the results return with elevated levels. 1/5 Crawford Construction Corp. - Estimate 3495 - 09/24/2024 Code Description Plumbing: Sewer clean-out - 6" diameter - 1.00 EA Quantity Rate Amount 1 $950.00 $950.00 1 $925.00 $925.00 Includes: 6" diameter sewer cleanout, 3 connectors, and installation labor. Excludes: Riser and cap, excavation and backfill. Quality: 6" diameter cast iron or PVC cleanout. NOTES: Install clean out to toilets stack, that does not exist. Plumbing: Snake/Unclog Main Sewer Line w/ Camera Line Inspection - 1.00 EA Includes: Heavy Duty Automatic Auger Drain Cleaning Machine w/ Operator: 3 in to 4 in Drain Line I.D. Size Range, 100 ft Max. Run, 1/4" to 1โ. HVAC: Furnace or A/C - check, clean, replace filters and service 1.00 EA 1 $275.00 $275.00 Cabinetry - Up to 36" Vanity W/Top & Faucet - Complete Assembly - 1.00 EA 1 $605.50 $605.50 Bathroom: The existing is damaged due from water & neglect and requires replacement. Drywall Finishes: 1/2" water rock (greenboard) hung, taped ready for texture - 101.00 SF 101 $2.75 $277.75 1 $2,325.00 $2,325.00 1 $650.00 $650.00 Includes: Drywall, metal corner bead, joint compound (mud), drywall nails, joint tape, grabber screws, and installation labor. Labor cost to remove 1/2" drywall, including screws and/or nails, corner bead, and to discard in a job-site waste receptacle. Quality: 1/2" water resistant drywall hung, taped, not including texture. Shower Finishes: Tile shower - 101 to 120 SF - 1.00 EA Includes: Ceramic tile, grout, thinset, radius trim piece/bullnose, tile soap dish, the use of a ceramic tile saw, and installation labor. Labor cost to remove ceramic tile and to discard in a job-site waste receptacle. Excludes: Shower pan or mortar bed for the tile. Reglazing Fixture: Refinish bathtub - 1.00 EA Includes: Cleaning solution, etching chemical, bonding agent, primer, standard top-coat colors, sand paper and labor to refinish a standard bathtub. Excludes: Non standard colors. Quality: Aliphatic acrylic polyurethane coating for a standard white 5' steel, porcelain, cast iron with baked on enamel, or fiberglass bathtub. Notes: Intended for resurfacing a tub with minor chip repair. Flooring: Stretch Carpet and Pad to Track Strip - 1.00 EA 1 $225.00 $225.00 Electrical: Central air - Disconnect box - Up to 60 amp - non fused - 1.00 EA 1 $375.00 $375.00 13 $19.61 $254.93 6 $175.50 $1,053.00 Includes: Exterior-mount disconnect box and installation labor. Labor cost to remove a disconnect box and to discard in a job-site waste receptacle. Handrail(s) - Stairs & Halls Stairway: Handrail - round / oval - hardwood - wall mounted Includes: Handrail, bracket hardware, and installation labor Stairway - Step - treated riser and treads (per tread) Up to 4' - 1.00 EA Notes: Repair broken step at deck in three locations, patio door, left and right elevations. 2/5