← 8708 Willard Ave, Cleveland, OH 44102 · Portfolio index

Alternate Version - Repair Estimate - 8708 Willard Avenue, Cleveland, OH 44102 - 2.pdf

Generated 2026-07-01T16:39:32.685095+00:00 from live Dropbox Public folders.

Property8708 Willard Ave, Cleveland, OH 44102
Section08 - Repairs & Maintenance
Categorypdf
Relative path08 - Repairs & Maintenance/Alternate Version - Repair Estimate - 8708 Willard Avenue, Cleveland, OH 44102 - 2.pdf
Modified UTC2024-08-24T18:52:54+00:00
Size bytes192324
Extraction methodpdftotext-incremental

Description

ESTIMATE DATE: 08/20/2024 WORK ORDER # 213827 1015 Washtenaw Ave Ypsilanti, MI 48197 Phone: 734-219-9952 Email: client@annarborhomecare.com TO: EVERNEST HOLDINGS, LLC SERVICE ADDRESS - 8708 Willard Ave Cleveland, OH ESTIMATE SL. 1. 2. 3. DESCRIPTION Trim Tree – We will trim up to (2) large tree with measuring approx. 20” in diameter and height is approx. 22 ft. growing around the property. This tree branches are touching property roof and damaging it. This price includes all material, labor, and

Extracted Content

ESTIMATE DATE: 08/20/2024 WORK ORDER # 213827 1015 Washtenaw Ave Ypsilanti, MI 48197 Phone: 734-219-9952 Email: client@annarborhomecare.com TO: EVERNEST HOLDINGS, LLC SERVICE ADDRESS - 8708 Willard Ave Cleveland, OH ESTIMATE SL. 1. 2. 3. DESCRIPTION Trim Tree – We will trim up to (2) large tree with measuring approx. 20” in diameter and height is approx. 22 ft. growing around the property. This tree branches are touching property roof and damaging it. This price includes all material, labor, and disposal of generated debris. Clean Up Exterior – We will remove up to 15 cyds of exterior debris and clear out all the overgrowth, vines, and trim shrubs. Scope of work includes – • Remove Exterior debris up to 15 cyds. • Cut and remove all the overgrowth. • Trim individual shrubs. • Haul away generated debris. Repair Drywall and floor – We will cut and remove the uneven broken drywall area and repair with new material. Approx. area is 970 sqft. This work includes damaged drywall at the attic staircase, and missing attic flooring. Damaged/cracked ceiling and wall replace/repair for both interior and basement. treat and pex all the damage wall/ceiling at the toilet/bathroom. QTY PPU Total 2