← 86 Madison Ave, Albany, NY 12202 · Portfolio index
Rehab Progress Summary (March 2025) - 86 Madison Ave, Albany, NY 12202.docx
| Property | 86 Madison Ave, Albany, NY 12202 |
|---|---|
| Source property label | 86 Madison Ave, Albany, NY 12202 |
| Section | 08 - Repairs & Maintenance |
| Category | office |
| Relative path | 08 - Repairs & Maintenance/Rehab Progress Summary (March 2025) - 86 Madison Ave, Albany, NY 12202.docx |
| Modified UTC | 2026-05-30T18:19:02.0000000Z |
| Size bytes | 19525 |
| Extraction method | docx-xml-incremental |
Description
Rehab Progress Summary – 86 Madison (March 2025) Overview: March 2025 has been focused on an eviction at 86.2 , significant door and security repairs , furnishings and setup for new tenants , window concerns , and general maintenance and pest control . The eviction process required sheriff intervention and resulted in unexpected structural damage, requiring immediate barricading and repairs. Safety and habitability remain key concerns, especially regarding windows, doors, and electrical issues .
Extracted Content
Rehab Progress Summary – 86 Madison (March 2025) Overview: March 2025 has been focused on an eviction at 86.2 , significant door and security repairs , furnishings and setup for new tenants , window concerns , and general maintenance and pest control . The eviction process required sheriff intervention and resulted in unexpected structural damage, requiring immediate barricading and repairs. Safety and habitability remain key concerns, especially regarding windows, doors, and electrical issues . Key Work Completed: Eviction & Security Repairs (3/3 - 3/5): • Eviction of 86.2 tenants took several hours due to excessive belongings and resistance. • Rear door and window of 86.2 barricaded due to severe damage from forced entry. • Front door frame reinforced and re-aligned for proper closure. • Sheriff support lasted longer than usual , allowing more time to assess unit conditions. • Separate police incident in the rear of the building (unrelated to eviction). • Yale smart locks at 86 were reconnected for remote access. • Hinges of 86 front entrance reinforced to improve security. Unit Setup & Repairs (3/11 - 3/14): • 86.2: Bed frames and mattresses assembled/set up. • Furniture moved i