← 84 Madison Ave, Albany, NY 12202 · All properties
Daily Rehab Summaries and Invoices 2025-03-11 to 2025-03-27 - 84 Madison Ave, Albany, NY 12202.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 84 Madison Ave, Albany, NY 12202 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2025-03-28 |
| Dropbox path | 08 - Repairs & Maintenance/Daily Rehab Summaries and Invoices 2025-03-11 to 2025-03-27 - 84 Madison Ave, Albany, NY 12202.pdf |
What This File Appears To Be
84 Madison Rehab 3/11/25 84 madison 2 hrs @$45/hr Evan 4 hrs @$95/hr Wess 4 hrs @$75/hr Zohar Total $770 Summary: 84.2: pre measurements for thresholds and placement as well as the remaining treads of the stair case. More painting of the trims and moving around of placement. The vanity in the bathroom is fully operational and placed now. Just need to finish the other bathroom accessories for bathroom to be done. Putting this separate because it's too much of a mix to figure out what with what. 5
Text Preview
84 Madison Rehab 3/11/25 84 madison 2 hrs @$45/hr Evan 4 hrs @$95/hr Wess 4 hrs @$75/hr Zohar Total $770 Summary: 84.2: pre measurements for thresholds and placement as well as the remaining treads of the stair case. More painting of the trims and moving around of placement. The vanity in the bathroom is fully operational and placed now. Just need to finish the other bathroom accessories for bathroom to be done. Putting this separate because it's too much of a mix to figure out what with what. 5 hrs @$20/hr Jasmine Total $100 This was spent doing a variety of work around the many buildings. Some to setup 86.2, some to clean 88.0 of the mess, 84.2 work and etc. 3/12/25 84 madison 1 hr @$45/hr 2 hrs @$75/hr Zohar 4.5 hrs @$95/hr Wess Total $622.50 Summary: 84.2: floor preparations in landings and placement of transitions, more painting and preparations for getting kitchen counter top cut and placement for sink and etc 3/13/25 84 madison 1 hr @$45/hr Evan 4 hrs @$75/hr Zohar 6 hrs @$95/hr Wess 10 hrs @$20/hr Jasmine Total $1065 (1115 - 50 cashback) Summary: Finish support for stairs on 3rd flight, cuts for treads of those stairs, more flooring on landings, painting, preparations for furnishings 84 madison 6 hrs @$75/hr Zohar 7 hrs @$95/hr Wess Total $1115 Summary: Mounting of treads and adjusting stairs, reviewing roof for plans for rear egress for 3rd floor and roof repairs 3/17/25 84 madison 6 hrs @$75/hr Zohar 4.5 hrs @95/hr Wess Total $877.50 Summary: I had stopped in but I got an amalgamation of updates since last week. I think this was for washer and dryer hookups, garbage disposal switch, checking drains for washer, closet shelves, etc 3/18/25 84 madison 8 hrs @$45/hr Evan 8 hrs @$75/hr Zohar 2 hrs @$20/hr Nico Total $1000 Summary: Furnishings, clearing up of space, making piles for returns, thresholds put in place, preparations for railing for 3rd flight of stairs, rough preparations for kitchen countertops 3/19/25 84 madison 8 hrs @$45/hr Evan 4.5 hrs @$75/hr Zohar 1 hr @$20/hr Jasmine Total $317.50 (=717.50 -400 withdrawal) Summary: More furnishings, mounting brackets in place for tv, cabinets being finished up, preparations to close up the closets, preparations to seal and caulk the rest of the stairs that need it, do another coat of paint for the trims (crown, base and etc) in stairway, made additional material savings and returned them, washer was not acting like it should and I had repaired it since I diagnosed the problem as it happened and I heard it 3/20/25 84 madison 6 hrs @$45 Evan 7 hrs @$75/hr Zohar Total $795 Summary: Got the mounts for tv on the walls. Gonna program the tvs together first then put them up. Closet shelves repaired or made with hanging rods. We got the door repaired for the front closet and got new ones cut for the other two rooms which we will mount tomorrow. Got ceiling painted now in unit. Will be preparing to mount the room doors tomorrow for the bedrooms after we removed more stuff and get things ready in unit. 3/21/25 6.75 hrs @$45/hr Evan