Progress Report 2025-02-12 to 2025-03-12 - 84 Madison Ave, Albany, NY 12202.docx
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 84 Madison Ave, Albany, NY 12202 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | Office |
| Updated | 2026-05-30 |
| Dropbox path | 08 - Repairs & Maintenance/Progress Report 2025-02-12 to 2025-03-12 - 84 Madison Ave, Albany, NY 12202.docx |
What This File Appears To Be
Progress Report: 84 Madison Renovations Reporting Period: February 12 – March 12, 2025 Prepared By: [Your Name] 1. Summary of Work Completed Painting & Surface Preparation • Walls, trims, and baseboards were prepped, patched, sanded, and painted throughout multiple units. • Interior staircases received sealing and paint. • Kitchen, hallway, and bathroom painting was completed, with trim work ongoing. Staircase Renovations • Stair treads and risers were installed for multiple flights. • Final sta
Text Preview
Progress Report: 84 Madison Renovations Reporting Period: February 12 – March 12, 2025 Prepared By: [Your Name] 1. Summary of Work Completed Painting & Surface Preparation • Walls, trims, and baseboards were prepped, patched, sanded, and painted throughout multiple units. • Interior staircases received sealing and paint. • Kitchen, hallway, and bathroom painting was completed, with trim work ongoing. Staircase Renovations • Stair treads and risers were installed for multiple flights. • Final staircase leading to the third floor was prepped with complicated cuts completed. • New stair railings were purchased and prepared for installation. Bathroom Upgrades • A vanity was refurbished, fitted, and installed. • The vanity mirror was repaired and replaced. • Bathroom accessories are ready for final installation. • Discovered and addressed electrical splicing issues behind the old vanity mirror. Kitchen Renovations • Preparation for kitchen countertop and sink installation. • Garbage disposal removed and prepped for future setup. Electrical Work • Discovered arcing low-voltage wiring in the ceiling. • Diagnosed and secured junctions to eliminate dead lines . • Completed various electrical fixture repairs and replacements. Flooring & Carpentry • Floor landings and transitions were measured and prepped for final placement. • Weak flooring near the laundry area was identified and needs further assessment. Security & Organization • 84.1 was accessed, and locks were replaced and linked online. • Units were organized, and materials were relocated for a smoother workflow. • Cleanup and disposal of debris and unnecessary materials were conducted. 2. Labor & Cost Breakdown Total Hours Worked Worker Rate Hours Total Cost Evan (Handyman) $45/ hr 80.5 hrs $3,622.50 Zohar (Electrician) $75/ hr 68.5 hrs $5,137.50 Wess (Journeyman) $95/ hr 43.5 hrs $4,132.50 Jasmine (Painter) $20/ hr 66 hrs $1,320.00 General Contractor $35/ hr 2.75 hrs $96.25 Total Cost • Labor Cost: $14,716.63 • Material Expenses: $494.43 (Home Depot & Sink/Garbage Disposal) • Cashback Deductions: -$390 • ATM Withdrawals: -$1,200 • Final Total: $13,621.06 3. Next Steps • Complete final trim and baseboard painting . • Install kitchen countertops and finalize sink setup . • Finalize staircase railing installation . • Complete bathroom accessory installations . • Adjust floor transitions and landings . • Prepare for furniture move-in . This format provides a clear and professional overview of the project’s progress and upcoming tasks. Would you like me to make any modifications?