← 84 Madison Ave, Albany, NY 12202 · Portfolio index
Progress Report 2025-02-12 to 2025-03-12 - 84 Madison Ave, Albany, NY 12202.docx
| Property | 84 Madison Ave, Albany, NY 12202 |
|---|---|
| Source property label | 84 Madison Ave, Albany, NY 12202 |
| Section | 08 - Repairs & Maintenance |
| Category | office |
| Relative path | 08 - Repairs & Maintenance/Progress Report 2025-02-12 to 2025-03-12 - 84 Madison Ave, Albany, NY 12202.docx |
| Modified UTC | 2026-05-30T18:18:04.0000000Z |
| Size bytes | 16302 |
| Extraction method | docx-xml-incremental |
Description
Progress Report: 84 Madison Renovations Reporting Period: February 12 – March 12, 2025 Prepared By: [Your Name] 1. Summary of Work Completed Painting & Surface Preparation • Walls, trims, and baseboards were prepped, patched, sanded, and painted throughout multiple units. • Interior staircases received sealing and paint. • Kitchen, hallway, and bathroom painting was completed, with trim work ongoing. Staircase Renovations • Stair treads and risers were installed for multiple flights. • Final sta
Extracted Content
Progress Report: 84 Madison Renovations Reporting Period: February 12 – March 12, 2025 Prepared By: [Your Name] 1. Summary of Work Completed Painting & Surface Preparation • Walls, trims, and baseboards were prepped, patched, sanded, and painted throughout multiple units. • Interior staircases received sealing and paint. • Kitchen, hallway, and bathroom painting was completed, with trim work ongoing. Staircase Renovations • Stair treads and risers were installed for multiple flights. • Final staircase leading to the third floor was prepped with complicated cuts completed. • New stair railings were purchased and prepared for installation. Bathroom Upgrades • A vanity was refurbished, fitted, and installed. • The vanity mirror was repaired and replaced. • Bathroom accessories are ready for final installation. • Discovered and addressed electrical splicing issues behind the old vanity mirror. Kitchen Renovations • Preparation for kitchen countertop and sink installation. • Garbage disposal removed and prepped for future setup. Electrical Work • Discovered arcing low-voltage wiring in the ceiling. • Diagnosed and secured junctions to eliminate dead lines . • Completed various electrica