← 8143 S Sangamon St, Chicago, IL 60620 · All properties

Repair Invoice - 2023-11-01 - 8143 S Sangamon St, Chicago, IL 60620.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property8143 S Sangamon St, Chicago, IL 60620
FolderRepairs & Maintenance
KindPDF
Updated2023-11-01
Dropbox path08 - Repairs & Maintenance/Repair Invoice - 2023-11-01 - 8143 S Sangamon St, Chicago, IL 60620.pdf

What This File Appears To Be

Crawford Construction Corp. Estimate 5113 S Harper Ave Chicago, IL, 60615-4119 Estimate No: 2623 Date: 10/28/2023 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO: 35653 / Address: 8143 S Sangamon St Unit 2 Chicago IL 60620-3152 Code Description Plumbing: Bathtub - 1.00 EA Quantity Rate Amount 1 $1,785.00 $1,785.00 1 $150.00 $150.00 1 $925.00 $925.00 80 $3.75 $300.00 Includes: Batht

Text Preview

Crawford Construction Corp.

Estimate

5113 S Harper Ave
Chicago, IL, 60615-4119

Estimate No:

2623

Date:

10/28/2023

info@crawfordconstructioncorp.net
www.crawfordconstructioncorp.net
312.229.0134

For:

Home River Group LLC
9100 Keystone Crossing STE 610
Indianapolis, IN 4624

1

WO: 35653 / Address: 8143 S Sangamon St Unit 2 Chicago IL 60620-3152

Code

Description

Plumbing:

Bathtub - 1.00 EA

Quantity

Rate

Amount

1

$1,785.00

$1,785.00

1

$150.00

$150.00

1

$925.00

$925.00

80

$3.75

$300.00

Includes: Bathtub, drain set, and installation labor. Labor cost to remove a bathtub and to
discard in a job-site waste receptacle.
Quality: Standard color enameled steel with slip resistant bottom.
NOTES: The existing tub has a hole present, it will require replacement to prevent water during
showers from entering the unit below.
Plumbing:

Sink - double basin - Reset undermounted - 1.00 EA
NOTES: While completing the move-in ready clean the crew stated that the stainless steel
double sink is loose falling inside of the base cabinet.

Walll

Tile shower - 61 to 100 SF - 1.00 EA

Finishes:

Includes: Ceramic tile, grout, thinset, trim piece, the use of a ceramic tile saw, and installation
labor.
NOTES: In order to remove the tub, the crew will have to disturb the wall tile and drywall.

Wall

1/2" Cement board - 80.00 SF

Finishes:

Includes: 1/2" cement board, screws, tape, thinset, and installation labor. Labor cost to remove
a cement backer board and to discard in a job-site waste receptacle.
Parts Subtotal

1/2

$3,160.00

Crawford Construction Corp. - Estimate 2623 - 10/28/2023

2/2

Subtotal

$3,160.00

Includes TAX 0%

$0.00

Total

$3,160.00

Total

$3,160.00