← 7542 and 7656 S Colfax Ave, Chicago, IL 60649 · Portfolio index

Repair - 2024-11-04 - 7542 & 7656 S Colfax Ave, Chicago, IL 60649.pdf

Generated 2026-07-01T16:39:32.685095+00:00 from live Dropbox Public folders.

Property7542 and 7656 S Colfax Ave, Chicago, IL 60649
Section08 - Repairs & Maintenance
Categorypdf
Relative path08 - Repairs & Maintenance/Repair - 2024-11-04 - 7542 & 7656 S Colfax Ave, Chicago, IL 60649.pdf
Modified UTC2024-11-11T21:11:47+00:00
Size bytes468075
Extraction methodpdftotext-incremental

Description

Crawford Construction Corp. Estimate 5113 S Harper Ave Chicago, IL, 60615-4119 Estimate No: 3609 Date: 11/01/2024 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 Meld Number T5EP62F - 7542 S Colfax Ave #2, Chicago, IL 60649 Code Description Quantity Rate Amount Electrical Repairs: Circuit breaker - bolt-on - 2 pole, 15 to 60 amp - 2.00 EA 2 $225.00 $450.00 Door - Paint Paint door/wind

Extracted Content

Crawford Construction Corp. Estimate 5113 S Harper Ave Chicago, IL, 60615-4119 Estimate No: 3609 Date: 11/01/2024 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 Meld Number T5EP62F - 7542 S Colfax Ave #2, Chicago, IL 60649 Code Description Quantity Rate Amount Electrical Repairs: Circuit breaker - bolt-on - 2 pole, 15 to 60 amp - 2.00 EA 2 $225.00 $450.00 Door - Paint Paint door/window trim & jamb - 2 coats (per side) - 1.00 EA 1 $70.00 $70.00 Door Casing - 3 1/4" - 9.00 LF 9 $8.89 $80.01 1 $275.00 $275.00 1 $279.50 $279.50 Finishes: Trim: Includes: Casing, finish nails, and installation labor. Labor cost to remove casing and to discard in a job-site waste receptacle. Quality: 2 1/4" paint grade pine or equal with finger joints. Drywall Finshes: Patch drywall & paint - Min. charge - 1.00 EA Notes: Complete near door once lock is removed. Appliance: Refrigerator - Gasket (seal) replacement - 1.00 EA Parts Subtotal 1/7 $1,154.51 Crawford Construction Corp. - Estimate 3609 - 11/01/2024 2/7 Subtotal $1,154.51 TAX 10% $115.45 Total $1,269.96 Total $1,269.96