← 7542 and 7656 S Colfax Ave, Chicago, IL 60649 · All properties
2nd Floor Renovation Updated 2026-06-16 (signed) - 7542 S Colfax Ave, Chicago, IL 60620 - 7542 and 7656 S Colfax Ave, Chicago, IL 60649.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 7542 and 7656 S Colfax Ave, Chicago, IL 60649 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2026-06-16 |
| Dropbox path | 08 - Repairs & Maintenance/2nd Floor Renovation Updated 2026-06-16 (signed) - 7542 S Colfax Ave, Chicago, IL 60620 - 7542 and 7656 S Colfax Ave, Chicago, IL 60649.pdf |
What This File Appears To Be
AYAN MANAGEMENT, INC. 347.935.6368 Estimate for INVOICE Hemlane (Lofty Holding) DATE 6/10/2026 17 7542 S Colfax Ave, Chcago, IL 60649 415 704 6848 ecio10772.hemlane.com SL DESCRIPTION AMOUNT (USD) Quantity(Nos.) 2nd Floor Renovation: Price Includes: Labor, materials and garbage disposal: 1. Remove Existing floor and install new floor. 2. Install baseboard with toe 3. Painting wall & ceiling 4. Trim for 2 doors 5. Tile Replacement in kitchen Full (Existing tile is not available) 6. Add lighting a
Text Preview
AYAN MANAGEMENT, INC. 347.935.6368 Estimate for INVOICE Hemlane (Lofty Holding) DATE 6/10/2026 17 7542 S Colfax Ave, Chcago, IL 60649 415 704 6848 ecio10772.hemlane.com SL DESCRIPTION AMOUNT (USD) Quantity(Nos.) 2nd Floor Renovation: Price Includes: Labor, materials and garbage disposal: 1. Remove Existing floor and install new floor. 2. Install baseboard with toe 3. Painting wall & ceiling 4. Trim for 2 doors 5. Tile Replacement in kitchen Full (Existing tile is not available) 6. Add lighting and replace existing with new wiring and replace burn wiring. 7. Install new water heater 50 liter. 8. New Stove 9. New Fridge 10. Replace 8 door panels 11. Bathroom rodding 12. Reline of plumbing 13. Window curtain 18 pcs. SUB-TOTAL Tax (10.25%) Discount TOTAL AMOUNT 1 1 1 1 1 1 $9,934.77 $3,809.20 $3,631.93 $0.00 $3,565.88 $3,513.28 1 1 1 1 1 1 1 1 $1,809.73 $0.00 $0.00 $2,117.67 $250.00 $1,753.78 $2,369.67 $32,755.91 $32,755.91 Note: Price increse in 2 items. 1. I found 6 line is burned wiring 2. The tile I found its not same, I found tile after checking 7 store its same design but different tone that’s why we need to replace entire in kitchen. NOTES If you have any questions please call 347.935.6368 Payment Schedule 1. Upfront 1st Payment will due on 06/17/2026 $20,000 2. Upon completion Final Payment will be due on 06/26/2026 Remaining Balance deduct the Materials purchase amount Sign Here 3. after finish the work Final Payment will due n 06/26/2026 Remaining Balance deduct the Materials purchase amount