← 7542 and 7656 S Colfax Ave, Chicago, IL 60649 · All properties

Crawford Construction Estimate 2606 - 2023-10-03 - Vinyl Flooring and Trim - USD 4613.36 - 7656 S Colfax Ave - 7542 and 7656 S Colfax Ave, Chicago, IL 60649.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property7542 and 7656 S Colfax Ave, Chicago, IL 60649
FolderRepairs & Maintenance
KindPDF
Updated2023-10-14
Dropbox path08 - Repairs & Maintenance/Crawford Construction Estimate 2606 - 2023-10-03 - Vinyl Flooring and Trim - USD 4613.36 - 7656 S Colfax Ave - 7542 and 7656 S Colfax Ave, Chicago, IL 60649.pdf

What This File Appears To Be

Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 2606 Date: 10/03/2023 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO #: 35625 / 7656 S Colfax Ave Chicago IL 60649-6557 Code Description Flooring: Vinyl plank flooring - Standard grade - 948.00 SF Quantity Rate Amount 948 $4.40 $4,171.20 223 $1.68 $374.64 16 $4.22 $67.52 Includes: Vinyl pla

Text Preview

Crawford Construction Corp.

Estimate

5113 S Harper Ave

Estimate No:

2606

Date:

10/03/2023

Chicago, IL, 60615-4119
info@crawfordconstructioncorp.net
www.crawfordconstructioncorp.net
312.229.0134

For:

Home River Group LLC
9100 Keystone Crossing STE 610
Indianapolis, IN 4624

1

WO #: 35625 / 7656 S Colfax Ave Chicago IL 60649-6557

Code

Description

Flooring:

Vinyl plank flooring - Standard grade - 948.00 SF

Quantity

Rate

Amount

948

$4.40

$4,171.20

223

$1.68

$374.64

16

$4.22

$67.52

Includes: Vinyl plank flooring, insulation/padding and installation labor.
Quality: 4" x 36" floating vinyl plank with simulated wood design.
Trim:

Quarter round - 3/4" - 223.00 LF
Includes: Quarter round mold, finish nails, caulk and installation labor.

Trim:

Vinyl - transition strip - 16.00 LF

Parts Subtotal

1 / 10

$4,613.36

Subtotal

$4,613.36

Includes TAX 0%

$0.00

Total

$4,613.36

Total

$4,613.36

Crawford Construction Corp. - Estimate 2606 - 10/03/2023
1695925140190.jpg

2 / 10