← 656 E 126th St, Cleveland, Ohio 44108 · All properties

Repair Invoice - 2022-10-18 - 656 East 126th St, Cleveland, OH 44108 - 656 E 126th St, Cleveland, OH 44108.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property656 E 126th St, Cleveland, Ohio 44108
FolderRepairs & Maintenance
KindPDF
Updated2022-10-19
Dropbox path08 - Repairs & Maintenance/Repair Invoice - 2022-10-18 - 656 East 126th St, Cleveland, OH 44108 - 656 E 126th St, Cleveland, OH 44108.pdf

What This File Appears To Be

Exhibit A: Contractor Documents Just Us LLC ESTIMATE Est. # 8467-1 Contractor is being hired by B2B Realty on behalf of the property owner Prepared on: Project Address: INSERT DATE 656 E 126th Valid for 30 days Pricing includes parts and labour ITEM NAME ITEM DESCRIPTION UNITS TOTAL PRICE / UNIT 1 $ - inspection visual inspection 1 $ 85.00 $ 85.00 tub chaulk tub and shower 1 $ 230.00 $ 230.00 tub glaze tub and shower 1 $ 515.00 $ 515.00 tub put trim around bottom of the tub 1 $ 195.00 $ 195.00 l

Text Preview

Exhibit A: Contractor Documents

Just Us LLC

ESTIMATE
Est. #

8467-1

Contractor is being hired by B2B Realty

on behalf of the property owner
Prepared on:
Project Address:

INSERT DATE

656 E 126th

Valid for 30 days

Pricing includes parts and labour
ITEM NAME

ITEM DESCRIPTION

UNITS

TOTAL

PRICE / UNIT

1

$

-

inspection

visual inspection

1

$

85.00

$

85.00

tub

chaulk tub and shower

1

$

230.00

$

230.00

tub

glaze tub and shower

1

$

515.00

$

515.00

tub

put trim around bottom of the tub

1

$

195.00

$

195.00

lving room ceiling

ceiling tiles need to be secured in 2to 3 spots

1

$

575.00

$

575.00

kitchen

replace kitchen faucet

1

$

400.00

$

400.00

back porch

fix hole in porch reinforce railings

1

$

715.00

$

715.00

kitchen

rechaulk back of sink

1

$

140.00

$

140.00

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

Owner’s Initials: ________ Contractor’s Initials: ________ Project Manager’s Initials: ________
ITEM NAME

ITEM DESCRIPTION

UNITS

TOTAL

PRICE / UNIT

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-

1

$

-