← 614 E 97th St, Cleveland, Ohio 44108 · All properties

Repair - 2025-05-13 - 614 E 97th St, Cleveland, OH 44108 - 614 E 97th St, Cleveland, Ohio 44108.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property614 E 97th St, Cleveland, Ohio 44108
FolderRepairs & Maintenance
KindPDF
Updated2025-09-24
Dropbox path08 - Repairs & Maintenance/Repair - 2025-05-13 - 614 E 97th St, Cleveland, OH 44108 - 614 E 97th St, Cleveland, Ohio 44108.pdf

What This File Appears To Be

INVOICE Andrew Downing 709 Walden Pond Cir Hinckley, OH 44233 connect@usjobconnect.com +1 (703) 728-4321 Bill to Ship to Aligned Properties 18318 Pearl Rd Strongsville, Ohio 44136 Aligned Properties 18318 Pearl Rd Strongsville, Ohio 44136 Invoice details Invoice no.: WO # 8903-1 Terms: Due on receipt Invoice date: 05/13/2025 Due date: 05/13/2025 # Product or service Description 1. Services WO # 8903 - 614 E 97th St Qty Rate Amount 1 $260.00 $260.00 1 $240.00 $240.00 LABOR -Removed old tub surrou

Text Preview

INVOICE
Andrew Downing
709 Walden Pond Cir
Hinckley, OH 44233

connect@usjobconnect.com
+1 (703) 728-4321

Bill to

Ship to

Aligned Properties
18318 Pearl Rd
Strongsville, Ohio 44136

Aligned Properties
18318 Pearl Rd
Strongsville, Ohio 44136

Invoice details
Invoice no.: WO # 8903-1
Terms: Due on receipt
Invoice date: 05/13/2025
Due date: 05/13/2025

#

Product or service

Description

1.

Services

WO # 8903 - 614 E 97th St

Qty

Rate

Amount

1

$260.00

$260.00

1

$240.00

$240.00

LABOR
-Removed old tub surround that had been
painted numerous times and was leaking
severely, especially under the window
where it was ripped.
-Removed fixtures and installed a new 3
wall system with soap shelves in each
corner. Waited 1 day and sealed everything
with silicone.
-Installed and sealed trim.
-Installed faucet handles and diverter.
No more leaking and tenant is happy.
2.

Supplies

Tub Surround, adhesive, trim, caulk,
replacement wall section under window.

Ways to pay

Total

$500.00

Payment

-$500.00

Balance due

$0.00
Paid in Full