← 5541 S Peoria St, Chicago, IL 60621 · Portfolio index
Repair Estimate - 2024-10-10 - 5541 S Peoria St, Chicago, IL 60621.pdf
| Property | 5541 S Peoria St, Chicago, IL 60621 |
|---|---|
| Section | 08 - Repairs & Maintenance |
| Category | |
| Relative path | 08 - Repairs & Maintenance/Repair Estimate - 2024-10-10 - 5541 S Peoria St, Chicago, IL 60621.pdf |
| Modified UTC | 2024-11-11T18:36:35+00:00 |
| Size bytes | 27291 |
| Extraction method | pdftotext-incremental |
Description
Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3533 Date: 10/08/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 Meld Number TKILHQDB - Address: 5541 S Peoria St #2, Chicago, IL 60621 Code Description Ventilation: Chimney Cleaning and Debris Removal - 1.00 EA (Mandatoy) • Description: Clean and remove debris, including concrete, from th
Extracted Content
Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3533 Date: 10/08/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 Meld Number TKILHQDB - Address: 5541 S Peoria St #2, Chicago, IL 60621 Code Description Ventilation: Chimney Cleaning and Debris Removal - 1.00 EA (Mandatoy) • Description: Clean and remove debris, including concrete, from the chimney to ensure Quantity Rate Amount 30 $32.15 $964.50 28 $89.50 $2,506.00 proper ventilation for the water heater. The chimney is approximately 30 linear feet. • Scope of Work: o Thoroughly clean the interior of the chimney. o Remove all debris and concrete obstructing proper ventilation. o Inspect to ensure proper water heater ventilation post-cleaning. • Approximate Length: 28 LF • Additional Notes: Proper ventilation is essential for the water heater’s functionality and safety. Ventilation: (If Stainless steel flue liner - 28.00 LF Needed) Includes: Stainless steel flue liner and installation labor. Labor cost to remove a stainless steel flue liner Parts Subtotal 1/2 $3,470.50 Crawfo