← 5541 S Peoria St, Chicago, IL 60621 · Portfolio index

Repair Estimate - 2024-10-10 - 5541 S Peoria St, Chicago, IL 60621.pdf

Generated 2026-07-01T16:39:32.685095+00:00 from live Dropbox Public folders.

Property5541 S Peoria St, Chicago, IL 60621
Section08 - Repairs & Maintenance
Categorypdf
Relative path08 - Repairs & Maintenance/Repair Estimate - 2024-10-10 - 5541 S Peoria St, Chicago, IL 60621.pdf
Modified UTC2024-11-11T18:36:35+00:00
Size bytes27291
Extraction methodpdftotext-incremental

Description

Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3533 Date: 10/08/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 Meld Number TKILHQDB - Address: 5541 S Peoria St #2, Chicago, IL 60621 Code Description Ventilation: Chimney Cleaning and Debris Removal - 1.00 EA (Mandatoy) • Description: Clean and remove debris, including concrete, from th

Extracted Content

Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3533 Date: 10/08/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 Meld Number TKILHQDB - Address: 5541 S Peoria St #2, Chicago, IL 60621 Code Description Ventilation: Chimney Cleaning and Debris Removal - 1.00 EA (Mandatoy) • Description: Clean and remove debris, including concrete, from the chimney to ensure Quantity Rate Amount 30 $32.15 $964.50 28 $89.50 $2,506.00 proper ventilation for the water heater. The chimney is approximately 30 linear feet. • Scope of Work: o Thoroughly clean the interior of the chimney. o Remove all debris and concrete obstructing proper ventilation. o Inspect to ensure proper water heater ventilation post-cleaning. • Approximate Length: 28 LF • Additional Notes: Proper ventilation is essential for the water heater’s functionality and safety. Ventilation: (If Stainless steel flue liner - 28.00 LF Needed) Includes: Stainless steel flue liner and installation labor. Labor cost to remove a stainless steel flue liner Parts Subtotal 1/2 $3,470.50 Crawfo