← 5541 S Peoria St, Chicago, IL 60621 · Portfolio index
Repair Estimate - 2022-11-07 - 5541 S Peoria St, Chicago, IL 60621.pdf
| Property | 5541 S Peoria St, Chicago, IL 60621 |
|---|---|
| Section | 08 - Repairs & Maintenance |
| Category | |
| Relative path | 08 - Repairs & Maintenance/Repair Estimate - 2022-11-07 - 5541 S Peoria St, Chicago, IL 60621.pdf |
| Modified UTC | 2022-11-08T16:51:40+00:00 |
| Size bytes | 106356 |
| Extraction method | pdftotext-incremental |
Description
Estimate of Work Property Address Portfolio Name Work Order # Estimate Date 5541 S Peoria St Unit 1 (1st revisions) Lofty Holding 5541 S Peoria Street LLC 27648 10/20/22 Rooms Costs ($) Front Entry/Foyer $27.50 Hallway/Stairs 1 $423.04 Living Room $441.48 Dining Room 1 $1,290.50 Bedroom 1 $423.38 Bedroom 2 $1,112.48 Bedroom 3 $1,085.80 Bathroom 1 $700.00 Kitchen $705.14 Family Room $1,205.62 Miscellaneous $400.00 Total $7,814.94 DISCLAIMER: The estimate is based on information derived from our v
Extracted Content
Estimate of Work Property Address Portfolio Name Work Order # Estimate Date 5541 S Peoria St Unit 1 (1st revisions) Lofty Holding 5541 S Peoria Street LLC 27648 10/20/22 Rooms Costs ($) Front Entry/Foyer $27.50 Hallway/Stairs 1 $423.04 Living Room $441.48 Dining Room 1 $1,290.50 Bedroom 1 $423.38 Bedroom 2 $1,112.48 Bedroom 3 $1,085.80 Bathroom 1 $700.00 Kitchen $705.14 Family Room $1,205.62 Miscellaneous $400.00 Total $7,814.94 DISCLAIMER: The estimate is based on information derived from our visual inspection observed at the time of our inspection. Actual cost may change should unforeseen conditions be uncovered during the course of work. This estimate is valid for 30 days from the date of this estimate. If owner does not provide their approval within the 30 day of this estimate, the estimate shall become null and void and owner would be subject to a reinspection fee required to generate a current estimate. Area Entry 1: From Common Area to Unit 12by6 Hallway/Stairs 1: 29by3 Closet 4by3 Comment -wipe and clean walls -paint baseboards, sand prior -seal gaps throughout flooring -replace missing standard CO2 detector -replace batteries in standard smoke detector -paint walls, patch