← 5541 S Peoria St, Chicago, IL 60621 · All properties

Repair Estimate - 5541 S Peoria St, Chicago, IL 60621.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property5541 S Peoria St, Chicago, IL 60621
FolderRepairs & Maintenance
KindPDF
Updated2024-11-29
Dropbox path08 - Repairs & Maintenance/Repair Estimate - 5541 S Peoria St, Chicago, IL 60621.pdf

What This File Appears To Be

Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3566 Date: 10/20/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO#: TMBQLVR / Address: 5541 S Peoria St Unit 1 Chicago, IL 60621 2 Water Damage & Plumbing Leak Proposal Code Description Cabinetry: Cabinetry - lower (base) units - good grade - 6.00 LF Quantity Rate Amount 6 $210.55 $1,263

Text Preview

Crawford Construction Corp.

Estimate

5113 S Harper Ave

Estimate No:

3566

Date:

10/20/2024

Chicago, IL, 60615-4119
info@crawfordconstructioncorp.net
www.crawfordconstructioncorp.net
312.229.0134

For:

Home River Group LLC
9100 Keystone Crossing STE 610
Indianapolis, IN 4624

1

WO#: TMBQLVR / Address: 5541 S Peoria St Unit 1 Chicago, IL 60621

2

Water Damage & Plumbing Leak Proposal

Code

Description

Cabinetry:

Cabinetry - lower (base) units - good grade - 6.00 LF

Quantity

Rate

Amount

6

$210.55

$1,263.30

6

$49.88

$299.28

1

$125.00

$125.00

2

$75.80

$151.60

1

$54.22

$54.22

1

$125.50

$125.50

Includes: Factory built, pre-finished (stained, painted, etc.) cabinets and installation labor. Labor
cost to remove lower cabinets and to discard in a job-site waste receptacle.
Countertops:

Countertop - flat laid plastic laminate - 6.00 LF
Includes: Flat-laid plastic laminate counter top, caulk, and installation labor. Labor cost to
remove a flat laid plastic laminate countertop and to discard in a job-site waste receptacle.

Plumbing:

Double sink & faucet - Detach & reset - 1.00 EA
Notes: Includes silicon sealant.

Plumbing:

Angle stop valve - 2.00 EA
Includes: Angle stop valve and installation labor. Labor cost to remove an angle stop and to
discard in a job-site waste receptacle.

Plumbing:

Supply lines for fixtures - 2.00 EA
Replace leaky plumbing valves underneath vanity sink.

Plumbing:

P-trap - Double sink - 1.00 EA
NOTES: Remove/reconfigure for proper drainage.

1/2

Crawford Construction Corp. - Estimate 3566 - 10/20/2024
Code

Description

Quantity

Rate

Parts Subtotal

Amount
$2,018.90

Subtotal

$2,018.90

TAX 7.5%

$151.42

Total

$2,170.32

Total

$2,170.32

Notes
The base cabinets are beyond repair due to active leaks behind the plumbing and supply lines. Mold growth has been detected in the base and panels,
causing the particle board to warp. We recommend replacing the damaged cabinets and countertops, and repairing the leaks to prevent future issues.
Please review our bid and advise if you would like to move forward with the repairs.

2/2