← 5541 S Peoria St, Chicago, IL 60621 · All properties
Repair Estimate - 5541 S Peoria St, Chicago, IL 60621.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 5541 S Peoria St, Chicago, IL 60621 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2024-11-29 |
| Dropbox path | 08 - Repairs & Maintenance/Repair Estimate - 5541 S Peoria St, Chicago, IL 60621.pdf |
What This File Appears To Be
Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3566 Date: 10/20/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO#: TMBQLVR / Address: 5541 S Peoria St Unit 1 Chicago, IL 60621 2 Water Damage & Plumbing Leak Proposal Code Description Cabinetry: Cabinetry - lower (base) units - good grade - 6.00 LF Quantity Rate Amount 6 $210.55 $1,263
Text Preview
Crawford Construction Corp. Estimate 5113 S Harper Ave Estimate No: 3566 Date: 10/20/2024 Chicago, IL, 60615-4119 info@crawfordconstructioncorp.net www.crawfordconstructioncorp.net 312.229.0134 For: Home River Group LLC 9100 Keystone Crossing STE 610 Indianapolis, IN 4624 1 WO#: TMBQLVR / Address: 5541 S Peoria St Unit 1 Chicago, IL 60621 2 Water Damage & Plumbing Leak Proposal Code Description Cabinetry: Cabinetry - lower (base) units - good grade - 6.00 LF Quantity Rate Amount 6 $210.55 $1,263.30 6 $49.88 $299.28 1 $125.00 $125.00 2 $75.80 $151.60 1 $54.22 $54.22 1 $125.50 $125.50 Includes: Factory built, pre-finished (stained, painted, etc.) cabinets and installation labor. Labor cost to remove lower cabinets and to discard in a job-site waste receptacle. Countertops: Countertop - flat laid plastic laminate - 6.00 LF Includes: Flat-laid plastic laminate counter top, caulk, and installation labor. Labor cost to remove a flat laid plastic laminate countertop and to discard in a job-site waste receptacle. Plumbing: Double sink & faucet - Detach & reset - 1.00 EA Notes: Includes silicon sealant. Plumbing: Angle stop valve - 2.00 EA Includes: Angle stop valve and installation labor. Labor cost to remove an angle stop and to discard in a job-site waste receptacle. Plumbing: Supply lines for fixtures - 2.00 EA Replace leaky plumbing valves underneath vanity sink. Plumbing: P-trap - Double sink - 1.00 EA NOTES: Remove/reconfigure for proper drainage. 1/2 Crawford Construction Corp. - Estimate 3566 - 10/20/2024 Code Description Quantity Rate Parts Subtotal Amount $2,018.90 Subtotal $2,018.90 TAX 7.5% $151.42 Total $2,170.32 Total $2,170.32 Notes The base cabinets are beyond repair due to active leaks behind the plumbing and supply lines. Mold growth has been detected in the base and panels, causing the particle board to warp. We recommend replacing the damaged cabinets and countertops, and repairing the leaks to prevent future issues. Please review our bid and advise if you would like to move forward with the repairs. 2/2