← 5541 S Peoria St, Chicago, IL 60621 · All properties
Repair Estimate - 2022-11-07 - 5541 S Peoria St, Chicago, IL 60621.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 5541 S Peoria St, Chicago, IL 60621 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2022-11-08 |
| Dropbox path | 08 - Repairs & Maintenance/Repair Estimate - 2022-11-07 - 5541 S Peoria St, Chicago, IL 60621.pdf |
What This File Appears To Be
Estimate of Work Property Address Portfolio Name Work Order # Estimate Date 5541 S Peoria St Unit 1 (1st revisions) Lofty Holding 5541 S Peoria Street LLC 27648 10/20/22 Rooms Costs ($) Front Entry/Foyer $27.50 Hallway/Stairs 1 $423.04 Living Room $441.48 Dining Room 1 $1,290.50 Bedroom 1 $423.38 Bedroom 2 $1,112.48 Bedroom 3 $1,085.80 Bathroom 1 $700.00 Kitchen $705.14 Family Room $1,205.62 Miscellaneous $400.00 Total $7,814.94 DISCLAIMER: The estimate is based on information derived from our v
Text Preview
Estimate of Work Property Address Portfolio Name Work Order # Estimate Date 5541 S Peoria St Unit 1 (1st revisions) Lofty Holding 5541 S Peoria Street LLC 27648 10/20/22 Rooms Costs ($) Front Entry/Foyer $27.50 Hallway/Stairs 1 $423.04 Living Room $441.48 Dining Room 1 $1,290.50 Bedroom 1 $423.38 Bedroom 2 $1,112.48 Bedroom 3 $1,085.80 Bathroom 1 $700.00 Kitchen $705.14 Family Room $1,205.62 Miscellaneous $400.00 Total $7,814.94 DISCLAIMER: The estimate is based on information derived from our visual inspection observed at the time of our inspection. Actual cost may change should unforeseen conditions be uncovered during the course of work. This estimate is valid for 30 days from the date of this estimate. If owner does not provide their approval within the 30 day of this estimate, the estimate shall become null and void and owner would be subject to a reinspection fee required to generate a current estimate. Area Entry 1: From Common Area to Unit 12by6 Hallway/Stairs 1: 29by3 Closet 4by3 Comment -wipe and clean walls -paint baseboards, sand prior -seal gaps throughout flooring -replace missing standard CO2 detector -replace batteries in standard smoke detector -paint walls, patch and prep needed -paint entryway from Dining Room, sand and reseal prior -paint both sides of entry door -paint door frame trim+Jam, sand and reseal -paint shelving and wall supports throughout, clean prior -paint walls, minor patch and prep needed -paint baseboards, sand and reseal Living Room 1: 15by13 -paint baseboards, sand prior -paint entryway from Dining Room, sand prior -paint walls, patch and prep needed -paint window ledge (total for all three windows), sand prior -paint window frame trim (total for all three windows) Dining Room 1: + FD Entry 14by12 -paint baseboards, sand prior -repairs needed for hardwood flooring: hole and broken planks, left of front door -sand and seal hardwood flooring (surface scratches and discoloration present) -magic eraser needed for metal front door -spot painting needed for door frame trim+Jam with color matching required, sand prior -replace two outlet covers for east and west walls -electrical repairs needed to east wall outlet: Open Ground on meter -cleaning needed for ceiling -paint walls, patch and prep needed with special attention needed for wall right of front door interior side -paint window ledge (total for both), sand prior -paint window frame trim (total for both), sand prior Bedroom 1: Off DR+FD Entry 10by10 -paint baseboard, sand prior -paint both sides of door -paint door frame trim plus jam, sand and reseal prior -replace missing globe for light fixture