← 3178 W 41st St, Cleveland, Ohio 44109 · All properties

Repair Invoice (2022-6-1) - Lofty Holding 9510 Silk Avenue & 3178 41st St LLC - 3178 W 41st St, Cleveland, OH 44109.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property3178 W 41st St, Cleveland, Ohio 44109
FolderRepairs
KindPDF
Updated2022-06-29
Dropbox pathRepairs/Repair Invoice (2022-6-1) - Lofty Holding 9510 Silk Avenue & 3178 41st St LLC - 3178 W 41st St, Cleveland, OH 44109.pdf

What This File Appears To Be

Estimate ESTIMATE # 7596: 3178 w41st DATE 05/31/2022 SERVICE DESCRIPTION QTY RATE AMOUNT basement basement flooded with sewage and cat feces from a liter box. gotta pump out water. and clean up mess. and totally disinfect and clean basement includes equipment 1 2,175.00 2,175.00 junk removal gotta throw away sewage contaminated contents in basement labor and dump fees 1 400.00 400.00 basement extras need to get moister out of the room. post water removal and sewage clean up. need to run dehumidi

Text Preview

Estimate
ESTIMATE # 7596: 3178 w41st
DATE 05/31/2022

SERVICE

DESCRIPTION

QTY

RATE

AMOUNT

basement

basement flooded with sewage and cat feces from a
liter box. gotta pump out water. and clean up mess.
and totally disinfect and clean basement includes
equipment

1

2,175.00

2,175.00

junk removal

gotta throw away sewage contaminated contents in
basement labor and dump fees

1

400.00

400.00

basement extras

need to get moister out of the room. post water
removal and sewage clean up. need to run
dehumidifier for a few days rental fee included if we
can skip this to save money we will

1

225.00

225.00

basement extras

basement post moister removal will need paint
possible on walls and floor. includes material and
supplys

1

450.00

450.00

basement extras

hot water tank inspection to make sure its not
damaged from flood also furnace free

1

0.00

0.00

total price

multiple guys multiple days includes tool rentals for
dehumidifier. and special equipment for hazard
waste.
break down is more based off type of job being
hazardous and the cost of the equipment and legal
disposal etc. call me if you have any questions
about the situation.

1

15% mark up

B2b 15% mark up

1

SUBTOTAL
TAX
TOTAL

Accepted By

Accepted Date

0.00

487.50

487.50T

3,737.50
31.69

$3,769.19