← 3139 West Blvd, Cleveland, OH 44111 · Portfolio index
Alternate Version - Repair Estimate - 2023-01-25 - 3139 West Blvd, Cleveland, OH 44111.pdf
| Property | 3139 West Blvd, Cleveland, OH 44111 |
|---|---|
| Section | 08 - Repairs & Maintenance |
| Category | |
| Relative path | 08 - Repairs & Maintenance/Alternate Version - Repair Estimate - 2023-01-25 - 3139 West Blvd, Cleveland, OH 44111.pdf |
| Modified UTC | 2023-01-25T22:24:57+00:00 |
| Size bytes | 102785 |
| Extraction method | pdftotext-incremental |
Description
Exhibit A: Contractor Documents ESTIMATE Contractor is being hired by B2B Property Management Est. #: 8341 Date: 12/16/2022 on behalf of the property owner Valid for 30 days Project Address: 3139 WEST BLVD., - RIGHT UNIT Pricing includes parts and labor INSPECTION ITEM # ITEM DESCRIPTION Replace damaged ceiling boards approximately total of 10 sf of boards. Color match existing paint and touch paint new boards. Install missing flooring board in rear porch Porch and steps repairs Rebuild rear ste
Extracted Content
Exhibit A: Contractor Documents ESTIMATE Contractor is being hired by B2B Property Management Est. #: 8341 Date: 12/16/2022 on behalf of the property owner Valid for 30 days Project Address: 3139 WEST BLVD., - RIGHT UNIT Pricing includes parts and labor INSPECTION ITEM # ITEM DESCRIPTION Replace damaged ceiling boards approximately total of 10 sf of boards. Color match existing paint and touch paint new boards. Install missing flooring board in rear porch Porch and steps repairs Rebuild rear step structure (wood). Make higher than existing. paint new wood with step additive for grip. Replace broken storm door down in unit Plumbing repair Electrical Item # Repair bathtub leak Redirect plumbing pipe running over electric panel box Install 3 ceiling fans. Ground several plugs Make repairs in panel box. UNITS TOTAL PRICE / UNIT 1 $ - $ 3,220.00 1 $ - $ 747.50 1 $ - $ 1,495.00 1 $ - $ SUBTOTAL $ 5,462.50 B2B PM $ 273.13 TOTAL $ 5,735.63 - Memo: Contractor shall furnish any and all permits required for the completion of the project. Pricing includes charges for labour and materials. Additional charges, deviation, or emergency repairs must be approved in writing by Owner. Contractor certi