← 27 Pillar Ln, Palm Coast, FL 32164 · All properties

[BLD - Swale Plan Diagram] 5 19 2023 - 2023021025 - 27 PILLAR LN - 07-11-31-7026-00420-0140 - HOLIDAY.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property27 Pillar Ln, Palm Coast, FL 32164
FolderProperty Records & Tax
KindPDF
Updated2026-06-17
Dropbox path11 - Property Records & Tax/Permits, Plans, Surveys/[BLD - Swale Plan Diagram] 5 19 2023 - 2023021025 - 27 PILLAR LN - 07-11-31-7026-00420-0140 - HOLIDAY.pdf

What This File Appears To Be

CIT Y A ID Permit #2023021025 OAST ALM INC COMPLETED - 5/19/2023 ORPORATED 199 9 STORMWATER & ENGINEERING DEPARTMENT SWALE PLAN GENERAL NOTES 1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City Stormwater Engineer). The finished swale elevation is with sod in place. 2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul

Text Preview

CIT Y A ID Permit #2023021025 OAST ALM INC COMPLETED - 5/19/2023 ORPORATED 199 9 STORMWATER & ENGINEERING DEPARTMENT SWALE PLAN GENERAL NOTES 1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City Stormwater Engineer). The finished swale elevation is with sod in place. 2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. 3. The finished grade of the swale along the edge of pavement is to be 2 inches (before sodding) below the upper edge of the pavement. 4. The swale must have a minimum slope of 0.1% (1 inch across an 80 foot lot) in the direction of flow shown on the Swale Plan. 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. 6. Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shal