← 1845 W 48th St, Cleveland, Ohio 44102 · All properties
CMHA Repair Estimate 2 02-02-2023 (UP Unit) - Lofty Holding 1845 W 48th Street LLC.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 1845 W 48th St, Cleveland, Ohio 44102 |
|---|---|
| Folder | Repairs & Maintenance |
| Kind | |
| Updated | 2023-02-07 |
| Dropbox path | 08 - Repairs & Maintenance/CMHA Repair Estimate 2 02-02-2023 (UP Unit) - Lofty Holding 1845 W 48th Street LLC.pdf |
What This File Appears To Be
Exhibit A: Contractor Documents ESTIMATE Contractor is being hired by B2B Property Management Est. #: 9131 Date: 1/25/2023 on behalf of the property owner Valid for 30 days Project Address: 1845 W 48th Pricing includes parts and labor INSPECTION ITEM # ITEM DESCRIPTION UNITS TOTAL PRICE / UNIT 1 General Requirements 1 $ - $ 287.00 2 Living Room - Window repair make functional 1 $ - $ 189.00 3 Electrical Hazards Kitchen and rear hall remove 220 line ensure rear hall lights working (2) 1 $ - $ 253
Text Preview
Exhibit A: Contractor Documents ESTIMATE Contractor is being hired by B2B Property Management Est. #: 9131 Date: 1/25/2023 on behalf of the property owner Valid for 30 days Project Address: 1845 W 48th Pricing includes parts and labor INSPECTION ITEM # ITEM DESCRIPTION UNITS TOTAL PRICE / UNIT 1 General Requirements 1 $ - $ 287.00 2 Living Room - Window repair make functional 1 $ - $ 189.00 3 Electrical Hazards Kitchen and rear hall remove 220 line ensure rear hall lights working (2) 1 $ - $ 253.00 4 Stove - Repair front right burner 1 $ - $ 51.00 6 Bathroom secure sink top caulk/seal 1 $ - $ 109.00 7 Shower Head repair 1 $ - $ 63.00 8 Hot water tank - inspection if properly working will light light up 1 $ - $ 115.00 9 Install handrail front entry stairway 1 $ - $ 299.00 10 HUD cycle cleaning 1 $ - $ 322.00 1 $ - $ 386.00 1 $ - $ 1,467.00 SUBTOTAL B2B PM $ 3,541.00 $ 177.05 TOTAL $ 3,718.05 11 12 Clean, prep, Prime, and paint kitchen pantry moisture damage noted Bedroom 1 Repair holes in walls, clean prep, prime and paint complete room Memo: Contractor shall furnish any and all permits required for the completion of the project. Pricing includes charges for labour and materials. Additional charges, deviation, or emergency repairs must be approved in writing by Owner. Contractor certifies having proper insurance coverage to carry out the project. B2B Property Management is acting as a project manager agent and shall not be held liable for any of the performance or quality of the work performed by Memo: Contractor shall furnish any and all permits required for the completion of the project. Pricing includes charges for labour and materials. Additional charges, deviation, or emergency repairs must be approved in writing by Owner. Contractor certifies having proper insurance coverage to carry out the project. B2B Property Management is acting as a project manager agent and shall not be held liable for any of the performance or quality of the work performed by contractor, nor for any delays in payment, or other failures of property owner to perform on its contractual duties and obligations. Owner’s Initials: ________ Contractor’s Initials: ________ Project Manager’s Initials: ________