← 1845 W 48th St, Cleveland, OH 44102 · Portfolio index
1845 W 48th UP - Turn Estimate 09-26-2022.pdf
| Property | 1845 W 48th St, Cleveland, OH 44102 |
|---|---|
| Section | Property Onboarding |
| Category | |
| Relative path | Property Onboarding/Repairs Estimate/1845 W 48th UP - Turn Estimate 09-26-2022.pdf |
| Modified UTC | 2022-09-27T00:35:29+00:00 |
| Size bytes | 110015 |
| Extraction method | pdftotext-incremental |
Description
Exhibit A: Contractor Documents ESTIMATE Est. # 8427-1 Contractor is being hired by B2B Realty on behalf of the property owner Prepared on: Project Address: 1845 W. 48th St. - UP Unit Valid for 30 days Pricing includes parts and labour ITEM NAME ITEM DESCRIPTION TOTAL UNITS PRICE / UNIT Screen door Replacing screen door 1 $ 345.00 $ 345.00 Kitchen Installation for kitchen cabinets 1 $ 115.00 $ 115.00 Living room Installing track for closet 1 $ 51.75 $ 51.75 Bedroom 1 Installing door handle 1 $ 8
Extracted Content
Exhibit A: Contractor Documents ESTIMATE Est. # 8427-1 Contractor is being hired by B2B Realty on behalf of the property owner Prepared on: Project Address: 1845 W. 48th St. - UP Unit Valid for 30 days Pricing includes parts and labour ITEM NAME ITEM DESCRIPTION TOTAL UNITS PRICE / UNIT Screen door Replacing screen door 1 $ 345.00 $ 345.00 Kitchen Installation for kitchen cabinets 1 $ 115.00 $ 115.00 Living room Installing track for closet 1 $ 51.75 $ 51.75 Bedroom 1 Installing door handle 1 $ 86.25 $ 86.25 Bedroom 2 repairing door 1 $ 40.25 $ 40.25 Bathroom Installing new shower handles 1 $ 115.00 $ 115.00 Smoke detectors Installing 2 new smoke detectors 1 $ 51.75 $ 51.75 Electrical plate Installing 2 cover plates 1 $ 11.50 $ 11.50 1 $ 287.50 $ 287.50 1 $ 34.50 $ 34.50 Paint Back door stairways Mud repair in bedroom and walls and paint touch up where needed Filling up gas in ceiling ith foam to prevent animal intrusion Lights Changing light fixtures in bedroom and hallway 1 $ 115.00 $ 115.00 Cleaning Removing trash 1 $ 46.00 $ 46.00 1 $ - $ - Owner’s Initials: ________ Contractor’s Initials: ________ Project Manager’s Initials: ________ ITEM NAME ITEM DESCRIPTION TOTAL UNITS PRICE