What This File Appears To Be

13806 Coit Rd, Cleveland, OH 44110 Renovations & Updates - Exterior: - Installed new shingle roof on the entire home - Installed some new storm windows on the second floor. - Installed some New window panes - Installed two new lighting fixtures exterior - Installed new hardware on two storm doors. - All Newly Painted exterior wood, porches, rails, masonry etc - Installed solar lights for exterior - Repaired a few potholes with new cement and seal-coated driveway - Basement: - Painted entire base

Text Preview

13806 Coit Rd, Cleveland, OH 44110
Renovations & Updates

-

Exterior:
- Installed new shingle roof on the entire home
- Installed some new storm windows on the second floor.
- Installed some New window panes
- Installed two new lighting fixtures exterior
- Installed new hardware on two storm doors.
- All Newly Painted exterior wood, porches, rails, masonry etc
- Installed solar lights for exterior
- Repaired a few potholes with new cement and seal-coated driveway

-

Basement:
- Painted entire basement walls and floor
- New handrail.
- New smoke alarms and carbon monoxide detectors in the basement
- Installed New Furnace in January 2022.
- Both furnaces were inspected by a licensed Heating Contractor
- Inspected & Repaired both First floor and Second floor
- Furnace by a licensed heating contractor.
- Installed New Hot gas hot water tank 2021

-

Interior:
- First Floor:
- In 2021 Painted the entire first floor
- In 2021 Installed new kitchen Floor
- In 2021 Installed New laminate throughout the entire first floor
- In 2021 Installed a new sub floor bathroom and new ceramic tile surround
- In 2021 Installed a new toilet
- In 2021 Installed New Kitchen Flooring
- In 2021 Reglazed bathtub
- Painted kitchen cabinets
- Some new plumbing kitchen & bathroom faucets

-

Some new lighting fixtures installed
New smoke alarms and carbon monoxide detectors on the first floor
Refurbished painted kitchen cabinets

Second Floor: (Most all improvements in 2020 and 2021)
- Painted the entire second floor
- Installed New Kitchen Floor
- Installed New Bathroom Floor
- Installed Toilet 2nd floor
- Installed new laminate flooring throughout the second floor
- Reglaze bathtub and new ceramic surround
- New plumbing bathroom faucets
- Some new lighting fixtures, outlets, and switches installed
- New storm door to porch balcony
- New smoke alarms and carbon monoxide detectors on the second floor
- Repaired drywall sections/ sanded/ painted
- Repaired installed new window/ panes
- New installed kitchen door off the rear hallway
- New storm door at front entry door on the front porch