What This File Appears To Be
13806 Coit Rd, Cleveland, OH 44110 Renovations & Updates - Exterior: - Installed new shingle roof on the entire home - Installed some new storm windows on the second floor. - Installed some New window panes - Installed two new lighting fixtures exterior - Installed new hardware on two storm doors. - All Newly Painted exterior wood, porches, rails, masonry etc - Installed solar lights for exterior - Repaired a few potholes with new cement and seal-coated driveway - Basement: - Painted entire base
Text Preview
13806 Coit Rd, Cleveland, OH 44110 Renovations & Updates - Exterior: - Installed new shingle roof on the entire home - Installed some new storm windows on the second floor. - Installed some New window panes - Installed two new lighting fixtures exterior - Installed new hardware on two storm doors. - All Newly Painted exterior wood, porches, rails, masonry etc - Installed solar lights for exterior - Repaired a few potholes with new cement and seal-coated driveway - Basement: - Painted entire basement walls and floor - New handrail. - New smoke alarms and carbon monoxide detectors in the basement - Installed New Furnace in January 2022. - Both furnaces were inspected by a licensed Heating Contractor - Inspected & Repaired both First floor and Second floor - Furnace by a licensed heating contractor. - Installed New Hot gas hot water tank 2021 - Interior: - First Floor: - In 2021 Painted the entire first floor - In 2021 Installed new kitchen Floor - In 2021 Installed New laminate throughout the entire first floor - In 2021 Installed a new sub floor bathroom and new ceramic tile surround - In 2021 Installed a new toilet - In 2021 Installed New Kitchen Flooring - In 2021 Reglazed bathtub - Painted kitchen cabinets - Some new plumbing kitchen & bathroom faucets - Some new lighting fixtures installed New smoke alarms and carbon monoxide detectors on the first floor Refurbished painted kitchen cabinets Second Floor: (Most all improvements in 2020 and 2021) - Painted the entire second floor - Installed New Kitchen Floor - Installed New Bathroom Floor - Installed Toilet 2nd floor - Installed new laminate flooring throughout the second floor - Reglaze bathtub and new ceramic surround - New plumbing bathroom faucets - Some new lighting fixtures, outlets, and switches installed - New storm door to porch balcony - New smoke alarms and carbon monoxide detectors on the second floor - Repaired drywall sections/ sanded/ painted - Repaired installed new window/ panes - New installed kitchen door off the rear hallway - New storm door at front entry door on the front porch