← 1315 E 114th St, Cleveland, OH 44106 · All properties
Sewer Inspection - 1315 E 114th St, Cleveland, OH 44106.pdf
This page is a searchable text preview. Use the Dropbox link for the full original file.
| Property | 1315 E 114th St, Cleveland, OH 44106 |
|---|---|
| Folder | Inspection Report |
| Kind | |
| Updated | 2022-11-11 |
| Dropbox path | 09 - Inspection Report/Sewer Inspection - 1315 E 114th St, Cleveland, OH 44106.pdf |
What This File Appears To Be
11/7/22, 11:25 PM Public Report · RIDGIDConnect Pillar To Post 431 Barbara Cir Wadsworth, OH 44281 (330) 334-3374 Sewer Lateral Inspection Nov 04, 2022 Lofty Al Inc. View Report Online 1315 E 114th St. Cleveland, OH 44106 A Visual Sewer Scope Inspection has been performed to inspect the condition of the home sewer line and to identify components in need of immediate repair. The inspection included the following: a proper access into the sewer line, a camera device was then inserted into the sewe
Text Preview
11/7/22, 11:25 PM Public Report | RIDGIDConnect Pillar To Post 431 Barbara Cir Wadsworth, OH 44281 (330) 334-3374 Sewer Lateral Inspection Nov 04, 2022 Lofty Al Inc. View Report Online 1315 E 114th St. Cleveland, OH 44106 A Visual Sewer Scope Inspection has been performed to inspect the condition of the home sewer line and to identify components in need of immediate repair. The inspection included the following: a proper access into the sewer line, a camera device was then inserted into the sewer line, the inspection process was recorded, and a report has been created to outline the findings. A web link video of the recording is included in this email. The evaluation is based on visual observations and based upon data collected from the inspection camera equipment. The inspection and report are not intended to be technically exhaustive. Pillar To Post has provided a report that is a summary of observations and unbiased opinions based on the experience of the inspector. The Inspection Report outlines and defines the portions of the sewer line that were inspected and indicates any areas that were not inspected, the reason they were not inspected, and general statements of what is commonly included and excluded during an inspection. The Inspection Report, together with the inspection agreement, represent the final statement on the condition of the sewer line when inspected and the final statement on what was included and/or excluded in the inspection. Your fee includes the cost of the basic Sewer Scope Inspection and a web link to your video of the process and findings. Files and Media https://www.ridgidconnect.com/sp/publicReport/pYUrDwsNxSNeA_iz!wsoPw/nMbbGrXxutj0Ni_XH!mAiQ 1/2 11/7/22, 11:25 PM Public Report | RIDGIDConnect 1315 E 114th St, Cleveland, OH 44106 Sewer Lateral inspection Follow Up Sewer lateral line has a blockage at 41'10" from the line access . 6" clay line on the outside of the house has heavy roots. Recommend cabling line prior to move in and yearly as maintenance to prevent a back up. Ferguson Team Nov 04, 2022 @ 7:15 pm https://www.ridgidconnect.com/sp/publicReport/pYUrDwsNxSNeA_iz!wsoPw/nMbbGrXxutj0Ni_XH!mAiQ 2/2