← 1315 E 114th St, Cleveland, OH 44106 · All properties

Fire Damage Estimate (2024-01-10) - 1315 E 114th St, Cleveland, OH 44106.pdf

This page is a searchable text preview. Use the Dropbox link for the full original file.

Open full file in Dropbox

Property1315 E 114th St, Cleveland, OH 44106
FolderRepairs & Maintenance
KindPDF
Updated2024-01-28
Dropbox path08 - Repairs & Maintenance/Fire Damage Estimate (2024-01-10) - 1315 E 114th St, Cleveland, OH 44106.pdf

What This File Appears To Be

Bluemoon Property Maintenance Meld#: TU3924MB Client Company: HomeRiver Group Address: 1315 E 114th St Cleveland, OH 44106 Roof Replacement Qty Price Total 1 $11,220.00 $11,220.00 It looks like someone tried to patch the roof. Roof is due for replacement. Price covers labor and materials. Third Floor: 1 $15,580.00 $15,580.00 1 $3,170.35 $3,170.35 1 $5,855.52 $5,855.52 -Rewire 3rd floor to basement (demo needed walls) -Repair damage drywall from 3rd floor to basement -lnstall batt lnsulate to ope

Text Preview

Bluemoon Property Maintenance
Meld#: TU3924MB

Client Company: HomeRiver Group
Address: 1315 E 114th St
Cleveland, OH 44106

Roof Replacement

Qty

Price

Total

1

$11,220.00

$11,220.00

It looks like someone tried to patch the roof. Roof is due for replacement. Price covers labor and materials.
Third Floor:

1

$15,580.00

$15,580.00

1

$3,170.35

$3,170.35

1

$5,855.52

$5,855.52

-Rewire 3rd floor to basement (demo needed walls)
-Repair damage drywall from 3rd floor to basement
-lnstall batt lnsulate to open ceiling and walls area
-lnstall 5/8" drywall at open area, tap and mud
-Texture newly install drywall
-Clean, prime and apply 2 coats of paint to all walls, trim, doors and
ceilings at '3rd floor
-Remove carpet at 3rd floor, stairs and replace
-lnstall new window at 3rd floor landing
- Replace light fixture and crown molding at front room
-Clean 3rd floor complete (includes roof joist system)
2nd Floor:
-lnstall missing drywall in closet at N/W Bedroom
-Paint closet
-Replace carpet at landing and stairs from 2nd to 1st floor
1st Floor:
-Replace carpet in entry, living and dinning rooms
-Replace missing ceiling tiles at ceiling in dinning room
-Demo damage landing at side door entry and rebuild
Total: $35,825.87